Delivery, Exercise and Corporate Actions

Futures Physical Delivery

The futures contracts listed below are settled by actual physical delivery of the underlying commodity (physical delivery futures), and customers may not make or receive delivery of the underlying commodity.

To avoid deliveries of expiring futures contracts as well as those resulting from futures options contracts, customers must roll forward or close out positions prior to the Start of the Close-Out Period. If a position exists at the Start of the Close-Out Period, the account becomes subject to an IB-generated liquidation trade. The liquidation trade will occur at some point between the Start of the Close-Out Period and the respective Cutoff.

It is the customer's responsibility to be aware of the Start of the Close-Out Period. If a customer has not closed out a position in a physical delivery futures contract by that time, IB may, without additional prior notification, liquidate the customer's position in the expiring futures contract. Note that liquidations will not otherwise impact working orders; customers must ensure that open orders to close positions are adjusted for the actual real-time position.


Exchange Trading Class Contract Month Description Applicable to Cash/IRA Accounts Only Start of Close-Out Period 2 Long Futures Cutoff 3 Long Futures Liquidation Short Futures Cutoff 4 Short Futures Liquidation
CDE CGB 201603 10-year Canadian Government Bond No 3 business days prior to cutoff 2016/02/25 16:00 (ET) 2016/02/23 6:00 (ET) 2016/03/21 13:00 (ET) 2016/03/17 6:00 (ET)
CDE CGB 201606 10-year Canadian Government Bond No 3 business days prior to cutoff 2016/05/27 16:00 (ET) 2016/05/25 6:00 (ET) 2016/06/21 13:00 (ET) 2016/06/17 6:00 (ET)
CDE CGB 201609 10-year Canadian Government Bond No 3 business days prior to cutoff 2016/08/29 16:00 (ET) 2016/08/25 6:00 (ET) 2016/09/21 13:00 (ET) 2016/09/19 6:00 (ET)
CDE CGB 201612 10-year Canadian Government Bond No 3 business days prior to cutoff 2016/11/28 16:00 (ET) 2016/11/24 6:00 (ET) 2016/12/19 13:00 (ET) 2016/12/15 6:00 (ET)
CDE CGF 201603 5-year Canadian Government Bond No 2 business days prior to cutoff 2016/02/25 16:00 (ET) 2016/02/24 6:00 (ET) 2016/03/21 16:00 (ET) 2016/03/18 6:00 (ET)
CDE CGF 201606 5-year Canadian Government Bond No 2 business days prior to cutoff 2016/05/27 16:00 (ET) 2016/05/26 6:00 (ET) 2016/06/21 16:00 (ET) 2016/06/20 6:00 (ET)
CDE CGF 201609 5-year Canadian Government Bond No 2 business days prior to cutoff 2016/08/29 16:00 (ET) 2016/08/26 6:00 (ET) 2016/09/21 16:00 (ET) 2016/09/20 6:00 (ET)
CDE CGF 201612 5-year Canadian Government Bond No 2 business days prior to cutoff 2016/11/28 16:00 (ET) 2016/11/25 6:00 (ET) 2016/12/19 16:00 (ET) 2016/12/16 6:00 (ET)
DTB FBTM 201603 Mid term Italian Bonds No 2 business days prior to cutoff 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET) 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET)
DTB FBTM 201606 Mid term Italian Bonds No 2 business days prior to cutoff 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET) 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET)
DTB FBTM 201609 Mid term Italian Bonds No 2 business days prior to cutoff 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET) 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET)
DTB FBTP 201603 Euro-BTP Italian Government Bond No 2 business days prior to cutoff 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET) 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET)
DTB FBTP 201606 Euro-BTP Italian Government Bond No 2 business days prior to cutoff 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET) 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET)
DTB FBTP 201609 Euro-BTP Italian Government Bond No 2 business days prior to cutoff 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET) 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET)
DTB FBTS 201603 Short-Term Euro-BTP Italian Bond No 2 business days prior to cutoff 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET) 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET)
DTB FBTS 201606 Short-Term Euro-BTP Italian Bond No 2 business days prior to cutoff 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET) 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET)
DTB FBTS 201609 Short-Term Euro-BTP Italian Bond No 2 business days prior to cutoff 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET) 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET)
DTB FCEF 201606 EUR/CHF Yes(1) 2 business days prior to cutoff 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET) 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET)
DTB FCEF 201612 EUR/CHF Yes(1) 2 business days prior to cutoff 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET) 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET)
DTB FCEF 201603 EUR/CHF Yes(1) 2 business days prior to cutoff 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET) 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET)
DTB FCEF 201609 EUR/CHF Yes(1) 2 business days prior to cutoff 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET) 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET)
DTB FCEF 201604 EUR/CHF Yes(1) 2 business days prior to cutoff 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET) 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET)
DTB FCEF 201605 EUR/CHF Yes(1) 2 business days prior to cutoff 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET) 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET)
DTB FCEP 201606 EUR/GBP Yes(1) 2 business days prior to cutoff 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET) 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET)
DTB FCEP 201612 EUR/GBP Yes(1) 2 business days prior to cutoff 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET) 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET)
DTB FCEP 201603 EUR/GBP Yes(1) 2 business days prior to cutoff 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET) 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET)
DTB FCEP 201609 EUR/GBP Yes(1) 2 business days prior to cutoff 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET) 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET)
DTB FCEP 201604 EUR/GBP Yes(1) 2 business days prior to cutoff 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET) 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET)
DTB FCEP 201605 EUR/GBP Yes(1) 2 business days prior to cutoff 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET) 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET)
DTB FCEU 201606 EUR/USD Yes(1) 2 business days prior to cutoff 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET) 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET)
DTB FCEU 201612 EUR/USD Yes(1) 2 business days prior to cutoff 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET) 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET)
DTB FCEU 201603 EUR/USD Yes(1) 2 business days prior to cutoff 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET) 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET)
DTB FCEU 201609 EUR/USD Yes(1) 2 business days prior to cutoff 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET) 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET)
DTB FCEU 201604 EUR/USD Yes(1) 2 business days prior to cutoff 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET) 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET)
DTB FCEU 201605 EUR/USD Yes(1) 2 business days prior to cutoff 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET) 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET)
DTB FCPF 201606 GBP/CHF Yes(1) 2 business days prior to cutoff 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET) 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET)
DTB FCPF 201612 GBP/CHF Yes(1) 2 business days prior to cutoff 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET) 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET)
DTB FCPF 201603 GBP/CHF Yes(1) 2 business days prior to cutoff 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET) 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET)
DTB FCPF 201609 GBP/CHF Yes(1) 2 business days prior to cutoff 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET) 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET)
DTB FCPF 201604 GBP/CHF Yes(1) 2 business days prior to cutoff 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET) 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET)
DTB FCPF 201605 GBP/CHF Yes(1) 2 business days prior to cutoff 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET) 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET)
DTB FCPU 201606 GBP/USD Yes(1) 2 business days prior to cutoff 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET) 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET)
DTB FCPU 201612 GBP/USD Yes(1) 2 business days prior to cutoff 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET) 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET)
DTB FCPU 201603 GBP/USD Yes(1) 2 business days prior to cutoff 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET) 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET)
DTB FCPU 201609 GBP/USD Yes(1) 2 business days prior to cutoff 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET) 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET)
DTB FCPU 201604 GBP/USD Yes(1) 2 business days prior to cutoff 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET) 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET)
DTB FCPU 201605 GBP/USD Yes(1) 2 business days prior to cutoff 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET) 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET)
DTB FCUF 201606 USD/CHF Yes(1) 2 business days prior to cutoff 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET) 2016/06/15 15:00 (CET) 2016/06/14 7:50 (CET)
DTB FCUF 201612 USD/CHF Yes(1) 2 business days prior to cutoff 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET) 2016/12/21 15:00 (CET) 2016/12/20 7:50 (CET)
DTB FCUF 201603 USD/CHF Yes(1) 2 business days prior to cutoff 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET) 2016/03/16 15:00 (CET) 2016/03/15 7:50 (CET)
DTB FCUF 201609 USD/CHF Yes(1) 2 business days prior to cutoff 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET) 2016/09/21 15:00 (CET) 2016/09/20 7:50 (CET)
DTB FCUF 201604 USD/CHF Yes(1) 2 business days prior to cutoff 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET) 2016/04/20 15:00 (CET) 2016/04/19 7:50 (CET)
DTB FCUF 201605 USD/CHF Yes(1) 2 business days prior to cutoff 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET) 2016/05/18 15:00 (CET) 2016/05/17 7:50 (CET)
DTB FGBL 201603 Euro BUND No 2 hours prior to cutoff 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET) 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET)
DTB FGBL 201606 Euro BUND No 2 hours prior to cutoff 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET) 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET)
DTB FGBL 201609 Euro BUND No 2 hours prior to cutoff 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET) 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET)
DTB FGBM 201603 Euro BOBL No 2 hours prior to cutoff 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET) 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET)
DTB FGBM 201606 Euro BOBL No 2 hours prior to cutoff 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET) 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET)
DTB FGBM 201609 Euro BOBL No 2 hours prior to cutoff 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET) 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET)
DTB FGBS 201603 Euro SCHATZ No 2 hours prior to cutoff 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET) 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET)
DTB FGBS 201606 Euro SCHATZ No 2 hours prior to cutoff 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET) 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET)
DTB FGBS 201609 Euro SCHATZ No 2 hours prior to cutoff 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET) 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET)
DTB FGBX 201603 Euro BUXL No 2 business days prior to cutoff 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET) 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET)
DTB FGBX 201606 Euro BUXL No 2 business days prior to cutoff 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET) 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET)
DTB FGBX 201609 Euro BUXL No 2 business days prior to cutoff 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET) 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET)
DTB FOAM 201603 Mid-term Euro-OAT French Government Bond Index No 2 business days prior to cutoff 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET) 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET)
DTB FOAM 201606 Mid-term Euro-OAT French Government Bond Index No 2 business days prior to cutoff 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET) 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET)
DTB FOAM 201609 Mid-term Euro-OAT French Government Bond Index No 2 business days prior to cutoff 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET) 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET)
DTB FOAT 201603 Euro-OAT French Government Bond Index No 2 business days prior to cutoff 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET) 2016/03/08 12:30 (CET) 2016/03/07 7:50 (CET)
DTB FOAT 201606 Euro-OAT French Government Bond Index No 2 business days prior to cutoff 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET) 2016/06/08 12:30 (CET) 2016/06/07 7:50 (CET)
DTB FOAT 201609 Euro-OAT French Government Bond Index No 2 business days prior to cutoff 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET) 2016/09/08 12:30 (CET) 2016/09/07 7:50 (CET)
ECBOT B1U 201603 30-Year Interest Rate Swap No 8 business days prior to cutoff 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT) 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT)
ECBOT B1U 201606 30-Year Interest Rate Swap No 8 business days prior to cutoff 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT) 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT)
ECBOT EH 201603 Ethanol No 2 business days prior to cutoff 2016/02/26 15:00 (CT) 2016/02/25 8:30 (CT) 2016/03/03 12:00 (CT) 2016/03/02 8:30 (CT)
ECBOT EH 201604 Ethanol No 2 business days prior to cutoff 2016/03/30 15:00 (CT) 2016/03/29 8:30 (CT) 2016/04/05 12:00 (CT) 2016/04/04 8:30 (CT)
ECBOT EH 201605 Ethanol No 2 business days prior to cutoff 2016/04/28 15:00 (CT) 2016/04/27 8:30 (CT) 2016/05/04 12:00 (CT) 2016/05/03 8:30 (CT)
ECBOT EH 201606 Ethanol No 2 business days prior to cutoff 2016/05/27 15:00 (CT) 2016/05/26 8:30 (CT) 2016/06/03 12:00 (CT) 2016/06/02 8:30 (CT)
ECBOT EH 201607 Ethanol No 2 business days prior to cutoff 2016/06/29 15:00 (CT) 2016/06/28 8:30 (CT) 2016/07/06 12:00 (CT) 2016/07/05 8:30 (CT)
ECBOT EH 201608 Ethanol No 2 business days prior to cutoff 2016/07/28 15:00 (CT) 2016/07/27 8:30 (CT) 2016/08/03 12:00 (CT) 2016/08/02 8:30 (CT)
ECBOT EH 201609 Ethanol No 2 business days prior to cutoff 2016/08/30 15:00 (CT) 2016/08/29 8:30 (CT) 2016/09/06 12:00 (CT) 2016/09/05 8:30 (CT)
ECBOT EH 201610 Ethanol No 2 business days prior to cutoff 2016/09/29 15:00 (CT) 2016/09/28 8:30 (CT) 2016/10/05 12:00 (CT) 2016/10/04 8:30 (CT)
ECBOT EH 201611 Ethanol No 2 business days prior to cutoff 2016/10/28 15:00 (CT) 2016/10/27 8:30 (CT) 2016/11/03 12:00 (CT) 2016/11/02 8:30 (CT)
ECBOT EH 201612 Ethanol No 2 business days prior to cutoff 2016/11/29 15:00 (CT) 2016/11/28 8:30 (CT) 2016/12/05 12:00 (CT) 2016/12/02 8:30 (CT)
ECBOT EH 201701 Ethanol No 2 business days prior to cutoff 2016/12/29 15:00 (CT) 2016/12/28 8:30 (CT) 2017/01/05 12:00 (CT) 2017/01/04 8:30 (CT)
ECBOT EH 201702 Ethanol No 2 business days prior to cutoff 2017/01/30 15:00 (CT) 2017/01/27 8:30 (CT) 2017/02/03 12:00 (CT) 2017/02/02 8:30 (CT)
ECBOT F1U 201603 5-Year Interest Rate Swap No 8 business days prior to cutoff 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT) 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT)
ECBOT F1U 201606 5-Year Interest Rate Swap No 8 business days prior to cutoff 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT) 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT)
ECBOT KE 201603 Kansas City Wheat No 2 business days prior to cutoff 2016/02/26 13:15 (CT) 2016/02/25 8:30 (CT) 2016/03/14 13:15 (CT) 2016/03/11 8:30 (CT)
ECBOT KE 201607 Kansas City Wheat No 2 business days prior to cutoff 2016/06/29 13:15 (CT) 2016/06/28 8:30 (CT) 2016/07/14 13:15 (CT) 2016/07/13 8:30 (CT)
ECBOT KE 201605 Kansas City Wheat No 2 business days prior to cutoff 2016/04/28 13:15 (CT) 2016/04/27 8:30 (CT) 2016/05/13 13:15 (CT) 2016/05/12 8:30 (CT)
ECBOT KE 201612 Kansas City Wheat No 2 business days prior to cutoff 2016/11/29 13:15 (CT) 2016/11/28 8:30 (CT) 2016/12/14 13:15 (CT) 2016/12/13 8:30 (CT)
ECBOT KE 201609 Kansas City Wheat No 2 business days prior to cutoff 2016/08/30 13:15 (CT) 2016/08/29 8:30 (CT) 2016/09/14 13:15 (CT) 2016/09/13 8:30 (CT)
ECBOT N1U 201603 10-Year Interest Rate Swap No 8 business days prior to cutoff 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT) 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT)
ECBOT N1U 201606 10-Year Interest Rate Swap No 8 business days prior to cutoff 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT) 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT)
ECBOT T1U 201603 2-Year Interest Rate Swap No 8 business days prior to cutoff 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT) 2016/03/14 14:00 (CT) 2016/03/03 8:30 (CT)
ECBOT T1U 201606 2-Year Interest Rate Swap No 8 business days prior to cutoff 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT) 2016/06/13 14:00 (CT) 2016/06/02 8:30 (CT)
ECBOT TN 201603 10-YR T-NOTES No 1 business day prior to cutoff 2016/02/26 15:15 (CT) 2016/02/26 7:20 (CT) 2016/03/21 12:00 (CT) 2016/03/21 7:20 (CT)
ECBOT TN 201606 10-YR T-NOTES No 1 business day prior to cutoff 2016/05/27 15:15 (CT) 2016/05/27 7:20 (CT) 2016/06/21 12:00 (CT) 2016/06/21 7:20 (CT)
ECBOT TN 201609 10-YR T-NOTES No 1 business day prior to cutoff 2016/08/30 15:15 (CT) 2016/08/30 7:20 (CT) 2016/09/21 12:00 (CT) 2016/09/21 7:20 (CT)
ECBOT UB 201603 Ultra T-BONDS No 2 business days prior to cutoff 2016/02/26 15:15 (CT) 2016/02/25 7:20 (CT) 2016/03/21 12:01 (CT) 2016/03/18 7:20 (CT)
ECBOT UB 201606 Ultra T-BONDS No 2 business days prior to cutoff 2016/05/27 15:15 (CT) 2016/05/26 7:20 (CT) 2016/06/21 12:01 (CT) 2016/06/20 7:20 (CT)
ECBOT UB 201609 Ultra T-BONDS No 2 business days prior to cutoff 2016/08/30 15:15 (CT) 2016/08/29 7:20 (CT) 2016/09/21 12:01 (CT) 2016/09/20 7:20 (CT)
ECBOT XC 201607 MINI CORN FUTURES No 1/= hours prior to cutoff 2016/06/29 13:45 (CT) 2016/06/29 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/14 8:30 (CT)
ECBOT XC 201612 MINI CORN FUTURES No 1/= hours prior to cutoff 2016/11/29 13:45 (CT) 2016/11/29 8:30 (CT) 2016/12/14 12:00 (CT) 2016/12/14 8:30 (CT)
ECBOT XC 201603 MINI CORN FUTURES No 1/= hours prior to cutoff 2016/02/26 13:45 (CT) 2016/02/26 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/14 8:30 (CT)
ECBOT XC 201605 MINI CORN FUTURES No 1/= hours prior to cutoff 2016/04/28 13:45 (CT) 2016/04/28 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/13 8:30 (CT)
ECBOT XC 201609 MINI CORN FUTURES No 1/= hours prior to cutoff 2016/08/30 13:45 (CT) 2016/08/30 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/14 8:30 (CT)
ECBOT XK 201611 MINI SOYBEAN FUTURES No 2/= hours prior to cutoff 2016/10/28 13:45 (CT) 2016/10/27 8:30 (CT) 2016/11/14 12:00 (CT) 2016/11/11 8:30 (CT)
ECBOT XK 201607 MINI SOYBEAN FUTURES No 2/= hours prior to cutoff 2016/06/29 13:45 (CT) 2016/06/28 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/13 8:30 (CT)
ECBOT XK 201605 MINI SOYBEAN FUTURES No 2/= hours prior to cutoff 2016/04/28 13:45 (CT) 2016/04/27 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/12 8:30 (CT)
ECBOT XK 201603 MINI SOYBEAN FUTURES No 2/= hours prior to cutoff 2016/02/26 13:45 (CT) 2016/02/25 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/11 8:30 (CT)
ECBOT XK 201608 MINI SOYBEAN FUTURES No 2/= hours prior to cutoff 2016/07/28 13:45 (CT) 2016/07/27 8:30 (CT) 2016/08/12 12:00 (CT) 2016/08/11 8:30 (CT)
ECBOT XK 201609 MINI SOYBEAN FUTURES No 2/= hours prior to cutoff 2016/08/30 13:45 (CT) 2016/08/29 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/13 8:30 (CT)
ECBOT XK 201701 MINI SOYBEAN FUTURES No 2/= hours prior to cutoff 2016/12/29 13:45 (CT) 2016/12/28 8:30 (CT) 2017/01/13 12:00 (CT) 2017/01/12 8:30 (CT)
ECBOT XW 201603 MINI WHEAT FUTURES No 1/= hours prior to cutoff 2016/02/26 13:45 (CT) 2016/02/26 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/14 8:30 (CT)
ECBOT XW 201607 MINI WHEAT FUTURES No 1/= hours prior to cutoff 2016/06/29 13:45 (CT) 2016/06/29 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/14 8:30 (CT)
ECBOT XW 201605 MINI WHEAT FUTURES No 1/= hours prior to cutoff 2016/04/28 13:45 (CT) 2016/04/28 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/13 8:30 (CT)
ECBOT XW 201612 MINI WHEAT FUTURES No 1/= hours prior to cutoff 2016/11/29 13:45 (CT) 2016/11/29 8:30 (CT) 2016/12/14 12:00 (CT) 2016/12/14 8:30 (CT)
ECBOT XW 201609 MINI WHEAT FUTURES No 1/= hours prior to cutoff 2016/08/30 13:45 (CT) 2016/08/30 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/14 8:30 (CT)
ECBOT Z3N 201603 3-YR TREAS. No 2 business days prior to cutoff 2016/02/26 15:15 (CT) 2016/02/25 8:30 (CT) 2016/03/31 12:01 (CT) 2016/03/30 8:30 (CT)
ECBOT Z3N 201606 3-YR TREAS. No 2 business days prior to cutoff 2016/05/27 15:15 (CT) 2016/05/26 8:30 (CT) 2016/06/30 12:01 (CT) 2016/06/29 8:30 (CT)
ECBOT Z3N 201609 3-YR TREAS. No 2 business days prior to cutoff 2016/08/30 15:15 (CT) 2016/08/29 8:30 (CT) 2016/09/30 12:01 (CT) 2016/09/29 8:30 (CT)
ECBOT ZB 201603 30-year T-BONDS No 2 hours prior to cutoff 2016/02/26 15:15 (CT) 2016/02/26 13:15 (CT) 2016/03/21 12:00 (CT) 2016/03/21 10:00 (CT)
ECBOT ZB 201606 30-year T-BONDS No 2 hours prior to cutoff 2016/05/27 15:15 (CT) 2016/05/27 13:15 (CT) 2016/06/21 12:00 (CT) 2016/06/21 10:00 (CT)
ECBOT ZB 201609 30-year T-BONDS No 2 hours prior to cutoff 2016/08/30 15:15 (CT) 2016/08/30 13:15 (CT) 2016/09/21 12:00 (CT) 2016/09/21 10:00 (CT)
ECBOT ZC 201607 Corn futures No 1 business day prior to cutoff 2016/06/29 13:20 (CT) 2016/06/29 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/14 8:30 (CT)
ECBOT ZC 201612 Corn futures No 1 business day prior to cutoff 2016/11/29 13:20 (CT) 2016/11/29 8:30 (CT) 2016/12/14 12:00 (CT) 2016/12/14 8:30 (CT)
ECBOT ZC 201603 Corn futures No 1 business day prior to cutoff 2016/02/26 13:20 (CT) 2016/02/26 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/14 8:30 (CT)
ECBOT ZC 201605 Corn futures No 1 business day prior to cutoff 2016/04/28 13:20 (CT) 2016/04/28 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/13 8:30 (CT)
ECBOT ZC 201609 Corn futures No 1 business day prior to cutoff 2016/08/30 13:20 (CT) 2016/08/30 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/14 8:30 (CT)
ECBOT ZF 201603 5-YR TREAS. No 2 hours prior to cutoff 2016/02/26 15:15 (CT) 2016/02/26 13:15 (CT) 2016/03/31 12:00 (CT) 2016/03/31 10:00 (CT)
ECBOT ZF 201606 5-YR TREAS. No 2 hours prior to cutoff 2016/05/27 15:15 (CT) 2016/05/27 13:15 (CT) 2016/06/30 12:00 (CT) 2016/06/30 10:00 (CT)
ECBOT ZF 201609 5-YR TREAS. No 2 hours prior to cutoff 2016/08/30 15:15 (CT) 2016/08/30 13:15 (CT) 2016/09/30 12:00 (CT) 2016/09/30 10:00 (CT)
ECBOT ZL 201612 SoyOil No 2 business days prior to cutoff 2016/11/29 13:15 (CT) 2016/11/28 8:30 (CT) 2016/12/14 12:00 (CT) 2016/12/13 8:30 (CT)
ECBOT ZL 201607 SoyOil No 2 business days prior to cutoff 2016/06/29 13:15 (CT) 2016/06/28 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/13 8:30 (CT)
ECBOT ZL 201610 SoyOil No 2 business days prior to cutoff 2016/09/29 13:15 (CT) 2016/09/28 8:30 (CT) 2016/10/14 12:00 (CT) 2016/10/13 8:30 (CT)
ECBOT ZL 201603 SoyOil No 2 business days prior to cutoff 2016/02/26 13:15 (CT) 2016/02/25 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/11 8:30 (CT)
ECBOT ZL 201605 SoyOil No 2 business days prior to cutoff 2016/04/28 13:15 (CT) 2016/04/27 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/12 8:30 (CT)
ECBOT ZL 201609 SoyOil No 2 business days prior to cutoff 2016/08/30 13:15 (CT) 2016/08/29 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/13 8:30 (CT)
ECBOT ZL 201608 SoyOil No 2 business days prior to cutoff 2016/07/28 13:15 (CT) 2016/07/27 8:30 (CT) 2016/08/12 12:00 (CT) 2016/08/11 8:30 (CT)
ECBOT ZL 201701 SoyOil No 2 business days prior to cutoff 2016/12/29 13:15 (CT) 2016/12/28 8:30 (CT) 2017/01/13 12:00 (CT) 2017/01/12 8:30 (CT)
ECBOT ZM 201612 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/11/29 13:15 (CT) 2016/11/28 8:30 (CT) 2016/12/14 12:00 (CT) 2016/12/13 8:30 (CT)
ECBOT ZM 201610 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/09/29 13:15 (CT) 2016/09/28 8:30 (CT) 2016/10/14 12:00 (CT) 2016/10/13 8:30 (CT)
ECBOT ZM 201607 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/06/29 13:15 (CT) 2016/06/28 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/13 8:30 (CT)
ECBOT ZM 201603 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/02/26 13:15 (CT) 2016/02/25 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/11 8:30 (CT)
ECBOT ZM 201609 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/08/30 13:15 (CT) 2016/08/29 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/13 8:30 (CT)
ECBOT ZM 201608 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/07/28 13:15 (CT) 2016/07/27 8:30 (CT) 2016/08/12 12:00 (CT) 2016/08/11 8:30 (CT)
ECBOT ZM 201605 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/04/28 13:15 (CT) 2016/04/27 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/12 8:30 (CT)
ECBOT ZM 201701 SOYBEAN MEAL FUTURES No 2 business days prior to cutoff 2016/12/29 13:15 (CT) 2016/12/28 8:30 (CT) 2017/01/13 12:00 (CT) 2017/01/12 8:30 (CT)
ECBOT ZN 201603 10-YR TREAS. No 2 hours prior to cutoff 2016/02/26 15:15 (CT) 2016/02/26 13:15 (CT) 2016/03/21 12:00 (CT) 2016/03/21 10:00 (CT)
ECBOT ZN 201606 10-YR TREAS. No 2 hours prior to cutoff 2016/05/27 15:15 (CT) 2016/05/27 13:15 (CT) 2016/06/21 12:00 (CT) 2016/06/21 10:00 (CT)
ECBOT ZN 201609 10-YR TREAS. No 2 hours prior to cutoff 2016/08/30 15:15 (CT) 2016/08/30 13:15 (CT) 2016/09/21 12:00 (CT) 2016/09/21 10:00 (CT)
ECBOT ZN 201612 10-YR TREAS. No 2 hours prior to cutoff 2016/11/29 15:15 (CT) 2016/11/29 13:15 (CT) 2016/12/20 12:00 (CT) 2016/12/20 10:00 (CT)
ECBOT ZO 201609 Oats No 2 business days prior to cutoff 2016/08/30 13:15 (CT) 2016/08/29 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/13 8:30 (CT)
ECBOT ZO 201607 Oats No 2 business days prior to cutoff 2016/06/29 13:15 (CT) 2016/06/28 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/13 8:30 (CT)
ECBOT ZO 201603 Oats No 2 business days prior to cutoff 2016/02/26 13:15 (CT) 2016/02/25 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/11 8:30 (CT)
ECBOT ZO 201605 Oats No 2 business days prior to cutoff 2016/04/28 13:15 (CT) 2016/04/27 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/12 8:30 (CT)
ECBOT ZO 201612 Oats No 2 business days prior to cutoff 2016/11/29 13:15 (CT) 2016/11/28 8:30 (CT) 2016/12/14 12:00 (CT) 2016/12/13 8:30 (CT)
ECBOT ZR 201603 ROUGH RICE FUTURES No 2 business days prior to cutoff 2016/02/26 13:15 (CT) 2016/02/25 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/11 8:30 (CT)
ECBOT ZR 201605 ROUGH RICE FUTURES No 2 business days prior to cutoff 2016/04/28 13:15 (CT) 2016/04/27 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/12 8:30 (CT)
ECBOT ZR 201607 ROUGH RICE FUTURES No 2 business days prior to cutoff 2016/06/29 13:15 (CT) 2016/06/28 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/13 8:30 (CT)
ECBOT ZR 201609 ROUGH RICE FUTURES No 2 business days prior to cutoff 2016/08/30 13:15 (CT) 2016/08/29 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/13 8:30 (CT)
ECBOT ZR 201611 ROUGH RICE FUTURES No 2 business days prior to cutoff 2016/10/28 13:15 (CT) 2016/10/27 8:30 (CT) 2016/11/14 12:00 (CT) 2016/11/11 8:30 (CT)
ECBOT ZR 201701 ROUGH RICE FUTURES No 2 business days prior to cutoff 2016/12/29 13:15 (CT) 2016/12/28 8:30 (CT) 2017/01/13 12:00 (CT) 2017/01/12 8:30 (CT)
ECBOT ZS 201607 SOYBEAN FUTURES No 2 business days prior to cutoff 2016/06/29 13:15 (CT) 2016/06/28 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/13 8:30 (CT)
ECBOT ZS 201611 SOYBEAN FUTURES No 2 business days prior to cutoff 2016/10/28 13:15 (CT) 2016/10/27 8:30 (CT) 2016/11/14 12:00 (CT) 2016/11/11 8:30 (CT)
ECBOT ZS 201605 SOYBEAN FUTURES No 2 business days prior to cutoff 2016/04/28 13:15 (CT) 2016/04/27 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/12 8:30 (CT)
ECBOT ZS 201608 SOYBEAN FUTURES No 2 business days prior to cutoff 2016/07/28 13:15 (CT) 2016/07/27 8:30 (CT) 2016/08/12 12:00 (CT) 2016/08/11 8:30 (CT)
ECBOT ZS 201609 SOYBEAN FUTURES No 2 business days prior to cutoff 2016/08/30 13:15 (CT) 2016/08/29 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/13 8:30 (CT)
ECBOT ZS 201603 SOYBEAN FUTURES No 2 business days prior to cutoff 2016/02/26 13:15 (CT) 2016/02/25 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/11 8:30 (CT)
ECBOT ZS 201701 SOYBEAN FUTURES No 2 business days prior to cutoff 2016/12/29 13:15 (CT) 2016/12/28 8:30 (CT) 2017/01/13 12:00 (CT) 2017/01/12 8:30 (CT)
ECBOT ZT 201603 2-YR TREAS. No 2 business days prior to cutoff 2016/02/26 15:15 (CT) 2016/02/25 7:20 (CT) 2016/03/31 12:00 (CT) 2016/03/30 7:20 (CT)
ECBOT ZT 201606 2-YR TREAS. No 2 business days prior to cutoff 2016/05/27 15:15 (CT) 2016/05/26 7:20 (CT) 2016/06/30 12:00 (CT) 2016/06/29 7:20 (CT)
ECBOT ZT 201609 2-YR TREAS. No 2 business days prior to cutoff 2016/08/30 15:15 (CT) 2016/08/29 7:20 (CT) 2016/09/30 12:00 (CT) 2016/09/29 7:20 (CT)
ECBOT ZW 201607 WHEAT FUTURES No 1 business day prior to cutoff 2016/06/29 13:15 (CT) 2016/06/29 8:30 (CT) 2016/07/14 12:00 (CT) 2016/07/14 8:30 (CT)
ECBOT ZW 201603 WHEAT FUTURES No 1 business day prior to cutoff 2016/02/26 13:15 (CT) 2016/02/26 8:30 (CT) 2016/03/14 12:00 (CT) 2016/03/14 8:30 (CT)
ECBOT ZW 201605 WHEAT FUTURES No 1 business day prior to cutoff 2016/04/28 13:15 (CT) 2016/04/28 8:30 (CT) 2016/05/13 12:00 (CT) 2016/05/13 8:30 (CT)
ECBOT ZW 201612 WHEAT FUTURES No 1 business day prior to cutoff 2016/11/29 13:15 (CT) 2016/11/29 8:30 (CT) 2016/12/14 12:00 (CT) 2016/12/14 8:30 (CT)
ECBOT ZW 201609 WHEAT FUTURES No 1 business day prior to cutoff 2016/08/30 13:15 (CT) 2016/08/30 8:30 (CT) 2016/09/14 12:00 (CT) 2016/09/14 8:30 (CT)
GLOBEX 6A 201603 AUSTRALIAN DOLLARS Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6A 201606 AUSTRALIAN DOLLARS Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6A 201609 AUSTRALIAN DOLLARS Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6A 201612 AUSTRALIAN DOLLARS Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6B 201603 BRITISH POUND Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6B 201606 BRITISH POUND Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6B 201609 BRITISH POUND Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6B 201612 BRITISH POUND Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6C 201603 CANADIAN DOLLAR Yes(1) 2 business days prior to cutoff 2016/03/15 09:16 (CT) 2016/03/14 8:30 (CT) 2016/03/15 09:16 (CT) 2016/03/14 8:30 (CT)
GLOBEX 6C 201606 CANADIAN DOLLAR Yes(1) 2 business days prior to cutoff 2016/06/14 09:16 (CT) 2016/06/13 8:30 (CT) 2016/06/14 09:16 (CT) 2016/06/13 8:30 (CT)
GLOBEX 6C 201609 CANADIAN DOLLAR Yes(1) 2 business days prior to cutoff 2016/09/20 09:16 (CT) 2016/09/19 8:30 (CT) 2016/09/20 09:16 (CT) 2016/09/19 8:30 (CT)
GLOBEX 6C 201612 CANADIAN DOLLAR Yes(1) 2 business days prior to cutoff 2016/12/20 09:16 (CT) 2016/12/19 8:30 (CT) 2016/12/20 09:16 (CT) 2016/12/19 8:30 (CT)
GLOBEX 6E 201603 EUROFX-EUR/USD Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6E 201606 EUROFX-EUR/USD Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6E 201609 EUROFX-EUR/USD Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6E 201612 EUROFX-EUR/USD Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6J 201603 JAPANESE YEN Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6J 201606 JAPANESE YEN Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6J 201609 JAPANESE YEN Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6J 201612 JAPANESE YEN Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6M 201603 MEXICAN PESO No 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6M 201606 MEXICAN PESO No 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6M 201609 MEXICAN PESO No 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6M 201604 MEXICAN PESO No 2 business days prior to cutoff 2016/04/18 09:16 (CT) 2016/04/15 8:30 (CT) 2016/04/18 09:16 (CT) 2016/04/15 8:30 (CT)
GLOBEX 6M 201605 MEXICAN PESO No 2 business days prior to cutoff 2016/05/16 09:16 (CT) 2016/05/13 8:30 (CT) 2016/05/16 09:16 (CT) 2016/05/13 8:30 (CT)
GLOBEX 6M 201612 MEXICAN PESO No 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6M 201607 MEXICAN PESO No 2 business days prior to cutoff 2016/07/18 09:16 (CT) 2016/07/15 8:30 (CT) 2016/07/18 09:16 (CT) 2016/07/15 8:30 (CT)
GLOBEX 6M 201608 MEXICAN PESO No 2 business days prior to cutoff 2016/08/15 09:16 (CT) 2016/08/12 8:30 (CT) 2016/08/15 09:16 (CT) 2016/08/12 8:30 (CT)
GLOBEX 6M 201610 MEXICAN PESO No 2 business days prior to cutoff 2016/10/17 09:16 (CT) 2016/10/14 8:30 (CT) 2016/10/17 09:16 (CT) 2016/10/14 8:30 (CT)
GLOBEX 6M 201611 MEXICAN PESO No 2 business days prior to cutoff 2016/11/14 09:16 (CT) 2016/11/11 8:30 (CT) 2016/11/14 09:16 (CT) 2016/11/11 8:30 (CT)
GLOBEX 6M 201701 MEXICAN PESO No 2 business days prior to cutoff 2017/01/13 09:16 (CT) 2017/01/12 8:30 (CT) 2017/01/13 09:16 (CT) 2017/01/12 8:30 (CT)
GLOBEX 6M 201702 MEXICAN PESO No 2 business days prior to cutoff 2017/02/13 09:16 (CT) 2017/02/10 8:30 (CT) 2017/02/13 09:16 (CT) 2017/02/10 8:30 (CT)
GLOBEX 6N 201603 NEW ZEALAND DOL No 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6N 201606 NEW ZEALAND DOL No 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6N 201609 NEW ZEALAND DOL No 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6N 201612 NEW ZEALAND DOL No 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6S 201603 SWISS FRANC Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6S 201606 SWISS FRANC Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6S 201609 SWISS FRANC Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6S 201612 SWISS FRANC Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6Z 201603 S AFRICAN RAND No 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX 6Z 201606 S AFRICAN RAND No 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX 6Z 201609 S AFRICAN RAND No 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX 6Z 201612 S AFRICAN RAND No 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX 6Z 201604 S AFRICAN RAND No 2 business days prior to cutoff 2016/04/18 09:16 (CT) 2016/04/15 8:30 (CT) 2016/04/18 09:16 (CT) 2016/04/15 8:30 (CT)
GLOBEX 6Z 201605 S AFRICAN RAND No 2 business days prior to cutoff 2016/05/16 09:16 (CT) 2016/05/13 8:30 (CT) 2016/05/16 09:16 (CT) 2016/05/13 8:30 (CT)
GLOBEX 6Z 201607 S AFRICAN RAND No 2 business days prior to cutoff 2016/07/18 09:16 (CT) 2016/07/15 8:30 (CT) 2016/07/18 09:16 (CT) 2016/07/15 8:30 (CT)
GLOBEX 6Z 201608 S AFRICAN RAND No 2 business days prior to cutoff 2016/08/15 09:16 (CT) 2016/08/12 8:30 (CT) 2016/08/15 09:16 (CT) 2016/08/12 8:30 (CT)
GLOBEX 6Z 201610 S AFRICAN RAND No 2 business days prior to cutoff 2016/10/17 09:16 (CT) 2016/10/14 8:30 (CT) 2016/10/17 09:16 (CT) 2016/10/14 8:30 (CT)
GLOBEX 6Z 201611 S AFRICAN RAND No 2 business days prior to cutoff 2016/11/14 09:16 (CT) 2016/11/11 8:30 (CT) 2016/11/14 09:16 (CT) 2016/11/11 8:30 (CT)
GLOBEX 6Z 201701 S AFRICAN RAND No 2 business days prior to cutoff 2017/01/13 09:16 (CT) 2017/01/12 8:30 (CT) 2017/01/13 09:16 (CT) 2017/01/12 8:30 (CT)
GLOBEX 6Z 201702 S AFRICAN RAND No 2 business days prior to cutoff 2017/02/13 09:16 (CT) 2017/02/10 8:30 (CT) 2017/02/13 09:16 (CT) 2017/02/10 8:30 (CT)
GLOBEX ACD 201603 AD/CD cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX ACD 201606 AD/CD cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX ACD 201609 AD/CD cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX ACD 201612 AD/CD cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX AJY 201603 AD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX AJY 201606 AD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX AJY 201609 AD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX AJY 201612 AD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX CJY 201603 CD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX CJY 201606 CD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX CJY 201609 CD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX CJY 201612 CD/JY cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX CNH 201603 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/03/13 15:15 (CT) 2016/03/10 8:30 (CT) 2016/03/13 15:15 (CT) 2016/03/10 8:30 (CT)
GLOBEX CNH 201606 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/06/12 15:15 (CT) 2016/06/09 8:30 (CT) 2016/06/12 15:15 (CT) 2016/06/09 8:30 (CT)
GLOBEX CNH 201609 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/09/18 15:15 (CT) 2016/09/15 8:30 (CT) 2016/09/18 15:15 (CT) 2016/09/15 8:30 (CT)
GLOBEX CNH 201612 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/12/18 15:15 (CT) 2016/12/15 8:30 (CT) 2016/12/18 15:15 (CT) 2016/12/15 8:30 (CT)
GLOBEX CNH 201604 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/04/17 15:15 (CT) 2016/04/14 8:30 (CT) 2016/04/17 15:15 (CT) 2016/04/14 8:30 (CT)
GLOBEX CNH 201605 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/05/15 15:15 (CT) 2016/05/12 8:30 (CT) 2016/05/15 15:15 (CT) 2016/05/12 8:30 (CT)
GLOBEX CNH 201607 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/07/17 15:15 (CT) 2016/07/14 8:30 (CT) 2016/07/17 15:15 (CT) 2016/07/14 8:30 (CT)
GLOBEX CNH 201608 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/08/14 15:15 (CT) 2016/08/11 8:30 (CT) 2016/08/14 15:15 (CT) 2016/08/11 8:30 (CT)
GLOBEX CNH 201610 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/10/16 15:15 (CT) 2016/10/13 8:30 (CT) 2016/10/16 15:15 (CT) 2016/10/13 8:30 (CT)
GLOBEX CNH 201611 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/11/13 15:15 (CT) 2016/11/10 8:30 (CT) 2016/11/13 15:15 (CT) 2016/11/10 8:30 (CT)
GLOBEX CNH 201701 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2017/01/12 15:15 (CT) 2017/01/11 8:30 (CT) 2017/01/12 15:15 (CT) 2017/01/11 8:30 (CT)
GLOBEX CNH 201702 US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2017/02/12 15:15 (CT) 2017/02/09 8:30 (CT) 2017/02/12 15:15 (CT) 2017/02/09 8:30 (CT)
GLOBEX CZK 201603 CZECH KORUNA No 5 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT)
GLOBEX CZK 201606 CZECH KORUNA No 5 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT)
GLOBEX CZK 201609 CZECH KORUNA No 5 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT)
GLOBEX CZK 201612 CZECH KORUNA No 5 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT)
GLOBEX E7 201603 EuroFX E-mini Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX E7 201606 EuroFX E-mini Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX EAD 201603 Euro FX/AD cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT) 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT)
GLOBEX EAD 201606 Euro FX/AD cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT) 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT)
GLOBEX EAD 201609 Euro FX/AD cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT) 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT)
GLOBEX EAD 201612 Euro FX/AD cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT) 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT)
GLOBEX ECD 201603 Euro FX/CD cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX ECD 201606 Euro FX/CD cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX ECD 201609 Euro FX/CD cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX ECD 201612 Euro FX/CD cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX ECK 201603 CZECH KORUNA/EURO FX No 5 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/08 7:20 (CT) 2016/03/14 09:16 (CT) 2016/03/08 7:20 (CT)
GLOBEX ECK 201606 CZECH KORUNA/EURO FX No 5 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/07 7:20 (CT) 2016/06/13 09:16 (CT) 2016/06/07 7:20 (CT)
GLOBEX ECK 201609 CZECH KORUNA/EURO FX No 5 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/13 7:20 (CT) 2016/09/19 09:16 (CT) 2016/09/13 7:20 (CT)
GLOBEX ECK 201612 CZECH KORUNA/EURO FX No 5 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/13 7:20 (CT) 2016/12/19 09:16 (CT) 2016/12/13 7:20 (CT)
GLOBEX EHF 201603 HUNGARIAN FORINT/EURO FX No 5 business days prior to cutoff 2016/03/14 14:00 (CT) 2016/03/08 7:20 (CT) 2016/03/14 14:00 (CT) 2016/03/08 7:20 (CT)
GLOBEX EHF 201606 HUNGARIAN FORINT/EURO FX No 5 business days prior to cutoff 2016/06/13 14:00 (CT) 2016/06/07 7:20 (CT) 2016/06/13 14:00 (CT) 2016/06/07 7:20 (CT)
GLOBEX EHF 201609 HUNGARIAN FORINT/EURO FX No 5 business days prior to cutoff 2016/09/19 14:00 (CT) 2016/09/13 7:20 (CT) 2016/09/19 14:00 (CT) 2016/09/13 7:20 (CT)
GLOBEX EHF 201612 HUNGARIAN FORINT/EURO FX No 5 business days prior to cutoff 2016/12/19 14:00 (CT) 2016/12/13 7:20 (CT) 2016/12/19 14:00 (CT) 2016/12/13 7:20 (CT)
GLOBEX EPZ 201603 POLISH ZLOTY/EURO FX No 5 business days prior to cutoff 2016/03/14 14:00 (CT) 2016/03/08 7:20 (CT) 2016/03/14 14:00 (CT) 2016/03/08 7:20 (CT)
GLOBEX EPZ 201606 POLISH ZLOTY/EURO FX No 5 business days prior to cutoff 2016/06/13 14:00 (CT) 2016/06/07 7:20 (CT) 2016/06/13 14:00 (CT) 2016/06/07 7:20 (CT)
GLOBEX EPZ 201609 POLISH ZLOTY/EURO FX No 5 business days prior to cutoff 2016/09/19 14:00 (CT) 2016/09/13 7:20 (CT) 2016/09/19 14:00 (CT) 2016/09/13 7:20 (CT)
GLOBEX EPZ 201612 POLISH ZLOTY/EURO FX No 5 business days prior to cutoff 2016/12/19 14:00 (CT) 2016/12/13 7:20 (CT) 2016/12/19 14:00 (CT) 2016/12/13 7:20 (CT)
GLOBEX HUF 201603 HUNGARIAN FORINT No 5 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT)
GLOBEX HUF 201606 HUNGARIAN FORINT No 5 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT)
GLOBEX HUF 201609 HUNGARIAN FORINT No 5 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT)
GLOBEX HUF 201612 HUNGARIAN FORINT No 5 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT)
GLOBEX ILS 201603 SHEKEL No 5 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT)
GLOBEX ILS 201606 SHEKEL No 5 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT)
GLOBEX ILS 201609 SHEKEL No 5 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT)
GLOBEX ILS 201612 SHEKEL No 5 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT)
GLOBEX J7 201603 Japanese Yen E-mini Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX J7 201606 Japanese Yen E-mini Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX LBS 201603 LUMBER110 FUTURES No 2 business days prior to cutoff 2016/03/15 12:05 (CT) 2016/03/14 9:00 (CT) 2016/03/15 12:05 (CT) 2016/03/14 9:00 (CT)
GLOBEX LBS 201605 LUMBER110 FUTURES No 2 business days prior to cutoff 2016/05/13 12:05 (CT) 2016/05/12 9:00 (CT) 2016/05/13 12:05 (CT) 2016/05/12 9:00 (CT)
GLOBEX LBS 201607 LUMBER110 FUTURES No 2 business days prior to cutoff 2016/07/15 12:05 (CT) 2016/07/14 9:00 (CT) 2016/07/15 12:05 (CT) 2016/07/14 9:00 (CT)
GLOBEX LBS 201609 LUMBER110 FUTURES No 2 business days prior to cutoff 2016/09/15 12:05 (CT) 2016/09/14 9:00 (CT) 2016/09/15 12:05 (CT) 2016/09/14 9:00 (CT)
GLOBEX LBS 201611 LUMBER110 FUTURES No 2 business days prior to cutoff 2016/11/15 12:05 (CT) 2016/11/14 9:00 (CT) 2016/11/15 12:05 (CT) 2016/11/14 9:00 (CT)
GLOBEX LBS 201701 LUMBER110 FUTURES No 2 business days prior to cutoff 2017/01/13 12:05 (CT) 2017/01/12 9:00 (CT) 2017/01/13 12:05 (CT) 2017/01/12 9:00 (CT)
GLOBEX LE 201602 LIVE CATTLE No 1 business day prior to cutoff 2016/02/08 15:15 (CT) 2016/02/08 8:30 (CT) 2016/02/29 12:00 (CT) 2016/02/29 8:30 (CT)
GLOBEX LE 201604 LIVE CATTLE No 1 business day prior to cutoff 2016/04/04 15:15 (CT) 2016/04/04 8:30 (CT) 2016/04/29 12:00 (CT) 2016/04/29 8:30 (CT)
GLOBEX LE 201606 LIVE CATTLE No 1 business day prior to cutoff 2016/06/06 15:15 (CT) 2016/06/06 8:30 (CT) 2016/06/30 12:00 (CT) 2016/06/30 8:30 (CT)
GLOBEX LE 201608 LIVE CATTLE No 1 business day prior to cutoff 2016/08/08 15:15 (CT) 2016/08/08 8:30 (CT) 2016/08/31 12:00 (CT) 2016/08/31 8:30 (CT)
GLOBEX LE 201610 LIVE CATTLE No 1 business day prior to cutoff 2016/10/10 15:15 (CT) 2016/10/10 8:30 (CT) 2016/10/31 12:00 (CT) 2016/10/31 8:30 (CT)
GLOBEX LE 201612 LIVE CATTLE No 1 business day prior to cutoff 2016/12/05 15:15 (CT) 2016/12/05 8:30 (CT) 2016/12/30 12:00 (CT) 2016/12/30 8:30 (CT)
GLOBEX M6A 201603 AUD/USD Micro Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX M6A 201606 AUD/USD Micro Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX M6B 201603 BRITISH POUND Micro Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX M6B 201606 BRITISH POUND Micro Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX M6C 201603 USD/CAD Micro Yes(1) 2 business days prior to cutoff 2016/03/15 09:16 (CT) 2016/03/14 8:30 (CT) 2016/03/15 09:16 (CT) 2016/03/14 8:30 (CT)
GLOBEX M6C 201606 USD/CAD Micro Yes(1) 2 business days prior to cutoff 2016/06/14 09:16 (CT) 2016/06/13 8:30 (CT) 2016/06/14 09:16 (CT) 2016/06/13 8:30 (CT)
GLOBEX M6E 201603 EUR/USD Micro Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX M6E 201606 EUR/USD Micro Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX M6J 201603 USD/JPY Micro Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX M6J 201606 USD/JPY Micro Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX M6S 201603 USD/CHF Micro Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX M6S 201606 USD/CHF Micro Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX MCD 201603 USD/CAD Micro Yes(1) 2 business days prior to cutoff 2016/03/15 09:16 (CT) 2016/03/14 8:30 (CT) 2016/03/15 09:16 (CT) 2016/03/14 8:30 (CT)
GLOBEX MCD 201606 USD/CAD Micro Yes(1) 2 business days prior to cutoff 2016/06/14 09:16 (CT) 2016/06/13 8:30 (CT) 2016/06/14 09:16 (CT) 2016/06/13 8:30 (CT)
GLOBEX MJY 201603 USD/JPY Micro Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX MJY 201606 USD/JPY Micro Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX MNH 201603 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/03/13 15:15 (CT) 2016/03/10 8:30 (CT) 2016/03/13 15:15 (CT) 2016/03/10 8:30 (CT)
GLOBEX MNH 201604 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/04/17 15:15 (CT) 2016/04/14 8:30 (CT) 2016/04/17 15:15 (CT) 2016/04/14 8:30 (CT)
GLOBEX MNH 201605 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/05/15 15:15 (CT) 2016/05/12 8:30 (CT) 2016/05/15 15:15 (CT) 2016/05/12 8:30 (CT)
GLOBEX MNH 201606 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/06/12 15:15 (CT) 2016/06/09 8:30 (CT) 2016/06/12 15:15 (CT) 2016/06/09 8:30 (CT)
GLOBEX MNH 201607 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/07/17 15:15 (CT) 2016/07/14 8:30 (CT) 2016/07/17 15:15 (CT) 2016/07/14 8:30 (CT)
GLOBEX MNH 201608 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/08/14 15:15 (CT) 2016/08/11 8:30 (CT) 2016/08/14 15:15 (CT) 2016/08/11 8:30 (CT)
GLOBEX MNH 201609 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/09/18 15:15 (CT) 2016/09/15 8:30 (CT) 2016/09/18 15:15 (CT) 2016/09/15 8:30 (CT)
GLOBEX MNH 201610 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/10/16 15:15 (CT) 2016/10/13 8:30 (CT) 2016/10/16 15:15 (CT) 2016/10/13 8:30 (CT)
GLOBEX MNH 201611 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/11/13 15:15 (CT) 2016/11/10 8:30 (CT) 2016/11/13 15:15 (CT) 2016/11/10 8:30 (CT)
GLOBEX MNH 201612 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2016/12/18 15:15 (CT) 2016/12/15 8:30 (CT) 2016/12/18 15:15 (CT) 2016/12/15 8:30 (CT)
GLOBEX MNH 201701 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2017/01/12 15:15 (CT) 2017/01/11 8:30 (CT) 2017/01/12 15:15 (CT) 2017/01/11 8:30 (CT)
GLOBEX MNH 201702 E-Micro US Dollars in Chinese Renminbi Offshore Yes(1) 2 business days prior to cutoff 2017/02/12 15:15 (CT) 2017/02/09 8:30 (CT) 2017/02/12 15:15 (CT) 2017/02/09 8:30 (CT)
GLOBEX MSF 201603 USD/CHF Micro Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX MSF 201606 USD/CHF Micro Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX NOK 201603 NORV KRONA No 5 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT)
GLOBEX NOK 201606 NORV KRONA No 5 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT)
GLOBEX NOK 201609 NORV KRONA No 5 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT)
GLOBEX NOK 201612 NORV KRONA No 5 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT)
GLOBEX PJY 201603 BP/JY cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/11 8:30 (CT)
GLOBEX PJY 201606 BP/JY cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/10 8:30 (CT)
GLOBEX PJY 201609 BP/JY cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/16 8:30 (CT)
GLOBEX PJY 201612 BP/JY cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/16 8:30 (CT)
GLOBEX PLN 201603 POLISH ZLOTY No 5 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT)
GLOBEX PLN 201606 POLISH ZLOTY No 5 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT)
GLOBEX PLN 201609 POLISH ZLOTY No 5 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT)
GLOBEX PLN 201612 POLISH ZLOTY No 5 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT)
GLOBEX PSF 201603 BP/SF cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT) 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT)
GLOBEX PSF 201606 BP/SF cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT) 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT)
GLOBEX PSF 201609 BP/SF cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT) 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT)
GLOBEX PSF 201612 BP/SF cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT) 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT)
GLOBEX RF 201603 Euro FX/SF cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT) 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT)
GLOBEX RF 201606 Euro FX/SF cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT) 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT)
GLOBEX RF 201609 Euro FX/SF cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT) 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT)
GLOBEX RF 201612 Euro FX/SF cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT) 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT)
GLOBEX RP 201603 Euro FX/BP cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT) 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT)
GLOBEX RP 201606 Euro FX/BP cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT) 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT)
GLOBEX RP 201609 Euro FX/BP cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT) 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT)
GLOBEX RP 201612 Euro FX/BP cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT) 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT)
GLOBEX RY 201603 Euro FX/JY cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT) 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT)
GLOBEX RY 201606 Euro FX/JY cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT) 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT)
GLOBEX RY 201609 Euro FX/JY cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT) 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT)
GLOBEX RY 201612 Euro FX/JY cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT) 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT)
GLOBEX SEK 201603 SWEDISH KRONA No 5 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT) 2016/03/14 09:16 (CT) 2016/03/08 8:30 (CT)
GLOBEX SEK 201606 SWEDISH KRONA No 5 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT) 2016/06/13 09:16 (CT) 2016/06/07 8:30 (CT)
GLOBEX SEK 201609 SWEDISH KRONA No 5 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT) 2016/09/19 09:16 (CT) 2016/09/13 8:30 (CT)
GLOBEX SEK 201612 SWEDISH KRONA No 5 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT) 2016/12/19 09:16 (CT) 2016/12/13 8:30 (CT)
GLOBEX SJY 201603 SF/JY cross rate Yes(1) 2 business days prior to cutoff 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT) 2016/03/14 09:16 (CT) 2016/03/11 7:20 (CT)
GLOBEX SJY 201606 SF/JY cross rate Yes(1) 2 business days prior to cutoff 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT) 2016/06/13 09:16 (CT) 2016/06/10 7:20 (CT)
GLOBEX SJY 201609 SF/JY cross rate Yes(1) 2 business days prior to cutoff 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT) 2016/09/19 09:16 (CT) 2016/09/16 7:20 (CT)
GLOBEX SJY 201612 SF/JY cross rate Yes(1) 2 business days prior to cutoff 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT) 2016/12/19 09:16 (CT) 2016/12/16 7:20 (CT)
ICEEU G 201603 Short Gilt No 2 business days prior to cutoff 2016/02/26 16:30 2016/02/25 8:00 2016/03/29 11:00 2016/03/28 8:00
ICEEU G 201606 Short Gilt No 2 business days prior to cutoff 2016/05/30 16:30 2016/05/27 8:00 2016/06/28 11:00 2016/06/27 8:00
ICEEU H 201603 Medium Gilt No 2 business days prior to cutoff 2016/02/26 16:30 2016/02/25 8:00 2016/03/29 11:00 2016/03/28 8:00
ICEEU H 201606 Medium Gilt No 2 business days prior to cutoff 2016/05/30 16:30 2016/05/27 8:00 2016/06/28 11:00 2016/06/27 8:00
ICEEU R 201603 Long Gilt No 2 business days prior to cutoff 2016/02/26 16:30 2016/02/25 8:00 2016/03/29 11:00 2016/03/28 8:00
ICEEU R 201606 Long Gilt No 2 business days prior to cutoff 2016/05/30 16:30 2016/05/27 8:00 2016/06/28 11:00 2016/06/27 8:00
ICEEU R 201609 Long Gilt No 2 business days prior to cutoff 2016/08/30 16:30 2016/08/29 8:00 2016/09/28 11:00 2016/09/27 8:00
ICEEUSOFT C 201603 Cocoa No 2 business days prior to cutoff 2016/03/14 12:00 2016/03/11 9:30 2016/03/14 12:00 2016/03/11 9:30
ICEEUSOFT C 201605 Cocoa No 2 business days prior to cutoff 2016/05/13 12:00 2016/05/12 9:30 2016/05/13 12:00 2016/05/12 9:30
ICEEUSOFT C 201607 Cocoa No 2 business days prior to cutoff 2016/07/14 12:00 2016/07/13 9:30 2016/07/14 12:00 2016/07/13 9:30
ICEEUSOFT C 201609 Cocoa No 2 business days prior to cutoff 2016/09/15 12:00 2016/09/14 9:30 2016/09/15 12:00 2016/09/14 9:30
ICEEUSOFT C 201612 Cocoa No 2 business days prior to cutoff 2016/12/13 12:00 2016/12/12 9:30 2016/12/13 12:00 2016/12/12 9:30
ICEEUSOFT RC 201603 Robusta coffee No 2 business days prior to cutoff 2016/03/01 17:30 2016/02/29 9:00 2016/03/31 12:30 2016/03/30 9:00
ICEEUSOFT RC 201605 Robusta coffee No 2 business days prior to cutoff 2016/05/03 17:30 2016/05/02 9:00 2016/05/31 12:30 2016/05/30 9:00
ICEEUSOFT RC 201607 Robusta coffee No 2 business days prior to cutoff 2016/07/01 17:30 2016/06/30 9:00 2016/07/29 12:30 2016/07/28 9:00
ICEEUSOFT RC 201609 Robusta coffee No 2 business days prior to cutoff 2016/09/01 17:30 2016/08/31 9:00 2016/09/30 12:30 2016/09/29 9:00
ICEEUSOFT RC 201611 Robusta coffee No 2 business days prior to cutoff 2016/11/01 17:30 2016/10/31 9:00 2016/11/30 12:30 2016/11/29 9:00
ICEEUSOFT RC 201701 Robusta coffee No 2 business days prior to cutoff 2017/01/03 17:30 2017/01/02 9:00 2017/01/31 12:30 2017/01/30 9:00
ICEEUSOFT T 201605 Wheat No 2 business days prior to cutoff 2016/04/25 16:30 2016/04/22 9:25 2016/05/23 12:30 2016/05/20 9:25
ICEEUSOFT T 201603 Wheat No 2 business days prior to cutoff 2016/02/23 16:30 2016/02/22 9:25 2016/03/23 12:30 2016/03/22 9:25
ICEEUSOFT T 201611 Wheat No 2 business days prior to cutoff 2016/10/25 16:30 2016/10/24 9:25 2016/11/23 12:30 2016/11/22 9:25
ICEEUSOFT T 201607 Wheat No 2 business days prior to cutoff 2016/06/24 16:30 2016/06/23 9:25 2016/07/07 12:30 2016/07/06 9:25
ICEEUSOFT T 201701 Wheat No 2 business days prior to cutoff 2016/12/26 16:30 2016/12/23 9:25 2017/01/23 12:30 2017/01/20 9:25
ICEEUSOFT W 201605 White sugar No 2 business days prior to cutoff 2016/04/15 17:55 2016/04/14 8:45 2016/04/15 17:55 2016/04/14 8:45
ICEEUSOFT W 201608 White sugar No 2 business days prior to cutoff 2016/07/15 17:55 2016/07/14 8:45 2016/07/15 17:55 2016/07/14 8:45
ICEEUSOFT W 201610 White sugar No 2 business days prior to cutoff 2016/09/15 17:55 2016/09/14 8:45 2016/09/15 17:55 2016/09/14 8:45
ICEEUSOFT W 201612 White sugar No 2 business days prior to cutoff 2016/11/15 17:55 2016/11/14 8:45 2016/11/15 17:55 2016/11/14 8:45
ICEEUSOFT W 201703 White sugar No 2 business days prior to cutoff 2017/02/13 17:55 2017/02/10 8:45 2017/02/13 17:55 2017/02/10 8:45
ICEUS IAU 201603 AUD USD Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS IAU 201606 AUD USD Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS IAU 201609 AUD USD Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS IAU 201612 AUD USD Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS IEJ 201603 EUR JPY Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS IEJ 201606 EUR JPY Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS IEJ 201609 EUR JPY Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS IEJ 201612 EUR JPY Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS IEO 201603 EUR USD Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS IEO 201606 EUR USD Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS IEO 201609 EUR USD Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS IEO 201612 EUR USD Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS IGB 201603 EUR GBP Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS IGB 201606 EUR GBP Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS IGB 201609 EUR GBP Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS IGB 201612 EUR GBP Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS IMP 201603 GBP USD Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS IMP 201606 GBP USD Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS IMP 201609 GBP USD Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS IMP 201612 GBP USD Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS ISN 201603 USD JPY Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS ISN 201606 USD JPY Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS ISN 201609 USD JPY Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS ISN 201612 USD JPY Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS KAU 201603 AUD Cash Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS KAU 201606 AUD Cash Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS KAU 201609 AUD Cash Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS KAU 201612 AUD Cash Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS KEJ 201603 Euro-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/03/14 10:16 (ET) 2016/03/11 8:05 (ET) 2016/03/14 10:16 (ET) 2016/03/11 8:05 (ET)
ICEUS KEJ 201606 Euro-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/06/13 10:16 (ET) 2016/06/10 8:05 (ET) 2016/06/13 10:16 (ET) 2016/06/10 8:05 (ET)
ICEUS KEJ 201609 Euro-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/09/19 10:16 (ET) 2016/09/16 8:05 (ET) 2016/09/19 10:16 (ET) 2016/09/16 8:05 (ET)
ICEUS KEJ 201612 Euro-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/12/19 10:16 (ET) 2016/12/16 8:05 (ET) 2016/12/19 10:16 (ET) 2016/12/16 8:05 (ET)
ICEUS KEO 201603 EUR Cash USD Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS KEO 201606 EUR Cash USD Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS KEO 201609 EUR Cash USD Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS KEO 201612 EUR Cash USD Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS KGB 201603 Euro-British Pound Index Yes(1) 2 business days prior to cutoff 2016/03/14 10:16 (ET) 2016/03/11 8:05 (ET) 2016/03/14 10:16 (ET) 2016/03/11 8:05 (ET)
ICEUS KGB 201606 Euro-British Pound Index Yes(1) 2 business days prior to cutoff 2016/06/13 10:16 (ET) 2016/06/10 8:05 (ET) 2016/06/13 10:16 (ET) 2016/06/10 8:05 (ET)
ICEUS KGB 201609 Euro-British Pound Index Yes(1) 2 business days prior to cutoff 2016/09/19 10:16 (ET) 2016/09/16 8:05 (ET) 2016/09/19 10:16 (ET) 2016/09/16 8:05 (ET)
ICEUS KGB 201612 Euro-British Pound Index Yes(1) 2 business days prior to cutoff 2016/12/19 10:16 (ET) 2016/12/16 8:05 (ET) 2016/12/19 10:16 (ET) 2016/12/16 8:05 (ET)
ICEUS KZY 201603 Swiss Franc-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/03/14 10:16 (ET) 2016/03/11 8:05 (ET) 2016/03/14 10:16 (ET) 2016/03/11 8:05 (ET)
ICEUS KZY 201606 Swiss Franc-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/06/13 10:16 (ET) 2016/06/10 8:05 (ET) 2016/06/13 10:16 (ET) 2016/06/10 8:05 (ET)
ICEUS KZY 201609 Swiss Franc-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/09/19 10:16 (ET) 2016/09/16 8:05 (ET) 2016/09/19 10:16 (ET) 2016/09/16 8:05 (ET)
ICEUS KZY 201612 Swiss Franc-Japanese Yen Index Yes(1) 2 business days prior to cutoff 2016/12/19 10:16 (ET) 2016/12/16 8:05 (ET) 2016/12/19 10:16 (ET) 2016/12/16 8:05 (ET)
ICEUS MP 201603 GBP USD Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS MP 201606 GBP USD Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS MP 201609 GBP USD Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS MP 201612 GBP USD Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
ICEUS SY 201603 USD JPY Yes(1) 2 business days prior to cutoff 2016/03/14 00:00 (ET) 2016/03/11 8:05 (ET) 2016/03/14 15:00 (ET) 2016/03/11 8:05 (ET)
ICEUS SY 201606 USD JPY Yes(1) 2 business days prior to cutoff 2016/06/13 00:00 (ET) 2016/06/10 8:05 (ET) 2016/06/13 15:00 (ET) 2016/06/10 8:05 (ET)
ICEUS SY 201609 USD JPY Yes(1) 2 business days prior to cutoff 2016/09/19 00:00 (ET) 2016/09/16 8:05 (ET) 2016/09/19 15:00 (ET) 2016/09/16 8:05 (ET)
ICEUS SY 201612 USD JPY Yes(1) 2 business days prior to cutoff 2016/12/19 00:00 (ET) 2016/12/16 8:05 (ET) 2016/12/19 15:00 (ET) 2016/12/16 8:05 (ET)
IPE ECF 201612 ICE ECX EUA No 2 business days prior to cutoff 2016/12/19 16:30 (GMT) 2016/12/16 7:00 (GMT) 2016/12/19 16:30 (GMT) 2016/12/16 7:00 (GMT)
IPE ECF 201609 ICE ECX EUA No 2 business days prior to cutoff 2016/09/26 16:30 (GMT) 2016/09/23 7:00 (GMT) 2016/09/26 16:30 (GMT) 2016/09/23 7:00 (GMT)
IPE ECF 201603 ICE ECX EUA No 2 business days prior to cutoff 2016/03/14 16:30 (GMT) 2016/03/11 7:00 (GMT) 2016/03/14 16:30 (GMT) 2016/03/11 7:00 (GMT)
IPE ECF 201606 ICE ECX EUA No 2 business days prior to cutoff 2016/06/27 16:30 (GMT) 2016/06/24 7:00 (GMT) 2016/06/27 16:30 (GMT) 2016/06/24 7:00 (GMT)
IPE ECF 201602 ICE ECX EUA No 2 business days prior to cutoff 2016/02/29 16:30 (GMT) 2016/02/26 7:00 (GMT) 2016/02/29 16:30 (GMT) 2016/02/26 7:00 (GMT)
IPE GOIL 201604 Gas Oil No 2 business days prior to cutoff 2016/04/12 12:00 (GMT) 2016/04/11 1:00 (GMT) 2016/04/12 12:00 (GMT) 2016/04/11 1:00 (GMT)
IPE GOIL 201610 Gas Oil No 2 business days prior to cutoff 2016/10/12 12:00 (GMT) 2016/10/11 1:00 (GMT) 2016/10/12 12:00 (GMT) 2016/10/11 1:00 (GMT)
IPE GOIL 201609 Gas Oil No 2 business days prior to cutoff 2016/09/12 12:00 (GMT) 2016/09/09 1:00 (GMT) 2016/09/12 12:00 (GMT) 2016/09/09 1:00 (GMT)
IPE GOIL 201702 Gas Oil No 2 business days prior to cutoff 2017/02/10 12:00 (GMT) 2017/02/09 1:00 (GMT) 2017/02/10 12:00 (GMT) 2017/02/09 1:00 (GMT)
IPE GOIL 201701 Gas Oil No 2 business days prior to cutoff 2017/01/12 12:00 (GMT) 2017/01/11 1:00 (GMT) 2017/01/12 12:00 (GMT) 2017/01/11 1:00 (GMT)
IPE GOIL 201606 Gas Oil No 2 business days prior to cutoff 2016/06/10 12:00 (GMT) 2016/06/09 1:00 (GMT) 2016/06/10 12:00 (GMT) 2016/06/09 1:00 (GMT)
IPE GOIL 201607 Gas Oil No 2 business days prior to cutoff 2016/07/12 12:00 (GMT) 2016/07/11 1:00 (GMT) 2016/07/12 12:00 (GMT) 2016/07/11 1:00 (GMT)
IPE GOIL 201605 Gas Oil No 2 business days prior to cutoff 2016/05/12 12:00 (GMT) 2016/05/11 1:00 (GMT) 2016/05/12 12:00 (GMT) 2016/05/11 1:00 (GMT)
IPE GOIL 201612 Gas Oil No 2 business days prior to cutoff 2016/12/12 12:00 (GMT) 2016/12/09 1:00 (GMT) 2016/12/12 12:00 (GMT) 2016/12/09 1:00 (GMT)
IPE GOIL 201608 Gas Oil No 2 business days prior to cutoff 2016/08/11 12:00 (GMT) 2016/08/10 1:00 (GMT) 2016/08/11 12:00 (GMT) 2016/08/10 1:00 (GMT)
IPE GOIL 201611 Gas Oil No 2 business days prior to cutoff 2016/11/10 12:00 (GMT) 2016/11/09 1:00 (GMT) 2016/11/10 12:00 (GMT) 2016/11/09 1:00 (GMT)
IPE GOIL 201603 Gas Oil No 2 business days prior to cutoff 2016/03/10 12:00 (GMT) 2016/03/09 1:00 (GMT) 2016/03/10 12:00 (GMT) 2016/03/09 1:00 (GMT)
IPE NGF 201609 Natural Gas No 2 business days prior to cutoff 2016/08/30 00:00 (GMT) 2016/08/29 7:00 (GMT) 2016/08/30 16:30 (GMT) 2016/08/29 7:00 (GMT)
IPE NGF 201610 Natural Gas No 2 business days prior to cutoff 2016/09/29 00:00 (GMT) 2016/09/28 7:00 (GMT) 2016/09/29 16:30 (GMT) 2016/09/28 7:00 (GMT)
IPE NGF 201611 Natural Gas No 2 business days prior to cutoff 2016/10/28 00:00 (GMT) 2016/10/27 7:00 (GMT) 2016/10/28 16:30 (GMT) 2016/10/27 7:00 (GMT)
IPE NGF 201605 Natural Gas No 2 business days prior to cutoff 2016/04/28 00:00 (GMT) 2016/04/27 7:00 (GMT) 2016/04/28 16:30 (GMT) 2016/04/27 7:00 (GMT)
IPE NGF 201603 Natural Gas No 2 business days prior to cutoff 2016/02/26 00:00 (GMT) 2016/02/25 7:00 (GMT) 2016/02/26 16:30 (GMT) 2016/02/25 7:00 (GMT)
IPE NGF 201606 Natural Gas No 2 business days prior to cutoff 2016/05/27 00:00 (GMT) 2016/05/26 7:00 (GMT) 2016/05/27 16:30 (GMT) 2016/05/26 7:00 (GMT)
IPE NGF 201607 Natural Gas No 2 business days prior to cutoff 2016/06/29 00:00 (GMT) 2016/06/28 7:00 (GMT) 2016/06/29 16:30 (GMT) 2016/06/28 7:00 (GMT)
IPE NGF 201701 Natural Gas No 2 business days prior to cutoff 2016/12/29 00:00 (GMT) 2016/12/28 7:00 (GMT) 2016/12/29 16:30 (GMT) 2016/12/28 7:00 (GMT)
IPE NGF 201702 Natural Gas No 2 business days prior to cutoff 2017/01/30 00:00 (GMT) 2017/01/27 7:00 (GMT) 2017/01/30 16:30 (GMT) 2017/01/27 7:00 (GMT)
IPE NGF 201612 Natural Gas No 2 business days prior to cutoff 2016/11/29 00:00 (GMT) 2016/11/28 7:00 (GMT) 2016/11/29 16:30 (GMT) 2016/11/28 7:00 (GMT)
IPE NGF 201608 Natural Gas No 2 business days prior to cutoff 2016/07/28 00:00 (GMT) 2016/07/27 7:00 (GMT) 2016/07/28 16:30 (GMT) 2016/07/27 7:00 (GMT)
IPE NGF 201604 Natural Gas No 2 business days prior to cutoff 2016/03/30 00:00 (GMT) 2016/03/29 7:00 (GMT) 2016/03/30 16:30 (GMT) 2016/03/29 7:00 (GMT)
KSE 175 201603 USD/KRW No 2 business days prior to cutoff 2016/03/21 11:30 2016/03/18 9:00 2016/03/21 11:30 2016/03/18 9:00
KSE 175 201606 USD/KRW No 2 business days prior to cutoff 2016/06/20 11:30 2016/06/17 9:00 2016/06/20 11:30 2016/06/17 9:00
KSE 175 201609 USD/KRW No 2 business days prior to cutoff 2016/09/19 11:30 2016/09/16 9:00 2016/09/19 11:30 2016/09/16 9:00
KSE 175 201604 USD/KRW No 2 business days prior to cutoff 2016/04/18 11:30 2016/04/15 9:00 2016/04/18 11:30 2016/04/15 9:00
KSE 175 201605 USD/KRW No 2 business days prior to cutoff 2016/05/16 11:30 2016/05/13 9:00 2016/05/16 11:30 2016/05/13 9:00
KSE 175 201612 USD/KRW No 2 business days prior to cutoff 2016/12/19 11:30 2016/12/16 9:00 2016/12/19 11:30 2016/12/16 9:00
KSE 175 201607 USD/KRW No 2 business days prior to cutoff 2016/07/18 11:30 2016/07/15 9:00 2016/07/18 11:30 2016/07/15 9:00
KSE 175 201608 USD/KRW No 2 business days prior to cutoff 2016/08/12 11:30 2016/08/11 9:00 2016/08/12 11:30 2016/08/11 9:00
MATIF EBM 201603 Milling Wheat No 2 business days prior to cutoff 2016/03/10 17:30 (CET) 2016/03/09 10:45 (CET) 2016/03/10 17:30 (CET) 2016/03/09 10:45 (CET)
MATIF EBM 201605 Milling Wheat No 2 business days prior to cutoff 2016/05/10 17:30 (CET) 2016/05/09 10:45 (CET) 2016/05/10 17:30 (CET) 2016/05/09 10:45 (CET)
MATIF EBM 201609 Milling Wheat No 2 business days prior to cutoff 2016/09/12 17:30 (CET) 2016/09/09 10:45 (CET) 2016/09/12 17:30 (CET) 2016/09/09 10:45 (CET)
MATIF EBM 201612 Milling Wheat No 2 business days prior to cutoff 2016/12/12 17:30 (CET) 2016/12/09 10:45 (CET) 2016/12/12 17:30 (CET) 2016/12/09 10:45 (CET)
MATIF ECO 201605 Rapeseed No 2 business days prior to cutoff 2016/04/29 17:30 (CET) 2016/04/28 10:45 (CET) 2016/04/29 17:30 (CET) 2016/04/28 10:45 (CET)
MATIF ECO 201608 Rapeseed No 2 business days prior to cutoff 2016/07/29 17:30 (CET) 2016/07/28 10:45 (CET) 2016/07/29 17:30 (CET) 2016/07/28 10:45 (CET)
MATIF ECO 201611 Rapeseed No 2 business days prior to cutoff 2016/10/31 17:30 (CET) 2016/10/28 10:45 (CET) 2016/10/31 17:30 (CET) 2016/10/28 10:45 (CET)
MATIF ECO 201702 Rapeseed No 2 business days prior to cutoff 2017/01/31 17:30 (CET) 2017/01/30 10:45 (CET) 2017/01/31 17:30 (CET) 2017/01/30 10:45 (CET)
MATIF EMA 201603 Corn No 2 business days prior to cutoff 2016/03/07 17:30 (CET) 2016/03/04 10:45 (CET) 2016/03/07 17:30 (CET) 2016/03/04 10:45 (CET)
MATIF EMA 201606 Corn No 2 business days prior to cutoff 2016/06/06 17:30 (CET) 2016/06/03 10:45 (CET) 2016/06/06 17:30 (CET) 2016/06/03 10:45 (CET)
MATIF EMA 201608 Corn No 2 business days prior to cutoff 2016/08/05 17:30 (CET) 2016/08/04 10:45 (CET) 2016/08/05 17:30 (CET) 2016/08/04 10:45 (CET)
MATIF EMA 201611 Corn No 2 business days prior to cutoff 2016/11/07 17:30 (CET) 2016/11/04 10:45 (CET) 2016/11/07 17:30 (CET) 2016/11/04 10:45 (CET)
MATIF EMA 201701 Corn No 2 business days prior to cutoff 2017/01/05 17:30 (CET) 2017/01/04 10:45 (CET) 2017/01/05 17:30 (CET) 2017/01/04 10:45 (CET)
MEXDER DA 201603 Dollar FX No 2 business days prior to cutoff 2016/03/14 14:00 (CDT) 2016/03/11 7:30 (CDT) 2016/03/14 14:00 (CDT) 2016/03/11 7:30 (CDT)
MEXDER DA 201604 Dollar FX No 2 business days prior to cutoff 2016/04/18 14:00 (CDT) 2016/04/15 7:30 (CDT) 2016/04/18 14:00 (CDT) 2016/04/15 7:30 (CDT)
MEXDER DA 201605 Dollar FX No 2 business days prior to cutoff 2016/05/16 14:00 (CDT) 2016/05/13 7:30 (CDT) 2016/05/16 14:00 (CDT) 2016/05/13 7:30 (CDT)
MEXDER DA 201606 Dollar FX No 2 business days prior to cutoff 2016/06/13 14:00 (CDT) 2016/06/10 7:30 (CDT) 2016/06/13 14:00 (CDT) 2016/06/10 7:30 (CDT)
MEXDER DA 201608 Dollar FX No 2 business days prior to cutoff 2016/08/15 14:00 (CDT) 2016/08/12 7:30 (CDT) 2016/08/15 14:00 (CDT) 2016/08/12 7:30 (CDT)
MEXDER DA 201610 Dollar FX No 2 business days prior to cutoff 2016/10/17 14:00 (CDT) 2016/10/14 7:30 (CDT) 2016/10/17 14:00 (CDT) 2016/10/14 7:30 (CDT)
MEXDER DA 201611 Dollar FX No 2 business days prior to cutoff 2016/11/14 14:00 (CDT) 2016/11/11 7:30 (CDT) 2016/11/14 14:00 (CDT) 2016/11/11 7:30 (CDT)
MEXDER DA 201612 Dollar FX No 2 business days prior to cutoff 2016/12/19 14:00 (CDT) 2016/12/16 7:30 (CDT) 2016/12/19 14:00 (CDT) 2016/12/16 7:30 (CDT)
MEXDER DA 201702 Dollar FX No 2 business days prior to cutoff 2017/02/13 14:00 (CDT) 2017/02/10 7:30 (CDT) 2017/02/13 14:00 (CDT) 2017/02/10 7:30 (CDT)
MEXDER DA 201607 Dollar FX No 2 business days prior to cutoff 2016/07/18 14:00 (CDT) 2016/07/15 7:30 (CDT) 2016/07/18 14:00 (CDT) 2016/07/15 7:30 (CDT)
MEXDER DA 201701 Dollar FX No 2 business days prior to cutoff 2017/01/16 14:00 (CDT) 2017/01/13 7:30 (CDT) 2017/01/16 14:00 (CDT) 2017/01/13 7:30 (CDT)
MEXDER DA 201609 Dollar FX No 2 business days prior to cutoff 2016/09/19 14:00 (CDT) 2016/09/16 7:30 (CDT) 2016/09/19 14:00 (CDT) 2016/09/16 7:30 (CDT)
MEXDER M10 201603 Spanish 10 years bonds No 2 business days prior to cutoff 2016/03/28 14:00 (CDT) 2016/03/25 7:30 (CDT) 2016/03/28 14:00 (CDT) 2016/03/25 7:30 (CDT)
MEXDER M10 201606 Spanish 10 years bonds No 2 business days prior to cutoff 2016/06/27 14:00 (CDT) 2016/06/24 7:30 (CDT) 2016/06/27 14:00 (CDT) 2016/06/24 7:30 (CDT)
MEXDER M10 201609 Spanish 10 years bonds No 2 business days prior to cutoff 2016/09/27 14:00 (CDT) 2016/09/26 7:30 (CDT) 2016/09/27 14:00 (CDT) 2016/09/26 7:30 (CDT)
MEXDER M10 201612 Spanish 10 years bonds No 2 business days prior to cutoff 2016/12/27 14:00 (CDT) 2016/12/26 7:30 (CDT) 2016/12/27 14:00 (CDT) 2016/12/26 7:30 (CDT)
MEXDER M3 201603 Spanish 3 years bonds No 2 business days prior to cutoff 2016/03/28 14:00 (CDT) 2016/03/25 7:30 (CDT) 2016/03/28 14:00 (CDT) 2016/03/25 7:30 (CDT)
MEXDER M3 201606 Spanish 3 years bonds No 2 business days prior to cutoff 2016/06/27 14:00 (CDT) 2016/06/24 7:30 (CDT) 2016/06/27 14:00 (CDT) 2016/06/24 7:30 (CDT)
MEXDER M3 201609 Spanish 3 years bonds No 2 business days prior to cutoff 2016/09/27 14:00 (CDT) 2016/09/26 7:30 (CDT) 2016/09/27 14:00 (CDT) 2016/09/26 7:30 (CDT)
MEXDER M3 201612 Spanish 3 years bonds No 2 business days prior to cutoff 2016/12/27 14:00 (CDT) 2016/12/26 7:30 (CDT) 2016/12/27 14:00 (CDT) 2016/12/26 7:30 (CDT)
NYBOT CC 201603 COCOA No 2 business days prior to cutoff 2016/02/16 13:30 (ET) 2016/02/15 8:00 (ET) 2016/03/15 11:50 (ET) 2016/03/14 8:00 (ET)
NYBOT CC 201605 COCOA No 2 business days prior to cutoff 2016/04/18 13:30 (ET) 2016/04/15 8:00 (ET) 2016/05/13 11:50 (ET) 2016/05/12 8:00 (ET)
NYBOT CC 201607 COCOA No 2 business days prior to cutoff 2016/06/17 13:30 (ET) 2016/06/16 8:00 (ET) 2016/07/14 11:50 (ET) 2016/07/13 8:00 (ET)
NYBOT CC 201609 COCOA No 2 business days prior to cutoff 2016/08/18 13:30 (ET) 2016/08/17 8:00 (ET) 2016/09/15 11:50 (ET) 2016/09/14 8:00 (ET)
NYBOT CC 201612 COCOA No 2 business days prior to cutoff 2016/11/16 13:30 (ET) 2016/11/15 8:00 (ET) 2016/12/14 11:50 (ET) 2016/12/13 8:00 (ET)
NYBOT CT 201603 COTTON No 2 business days prior to cutoff 2016/02/23 14:20 (ET) 2016/02/22 8:00 (ET) 2016/03/08 14:20 (ET) 2016/03/07 8:00 (ET)
NYBOT CT 201605 COTTON No 2 business days prior to cutoff 2016/04/25 14:20 (ET) 2016/04/22 8:00 (ET) 2016/05/06 14:20 (ET) 2016/05/05 8:00 (ET)
NYBOT CT 201607 COTTON No 2 business days prior to cutoff 2016/06/24 14:20 (ET) 2016/06/23 8:00 (ET) 2016/07/07 14:20 (ET) 2016/07/06 8:00 (ET)
NYBOT CT 201610 COTTON No 2 business days prior to cutoff 2016/09/26 14:20 (ET) 2016/09/23 8:00 (ET) 2016/10/07 14:20 (ET) 2016/10/06 8:00 (ET)
NYBOT CT 201612 COTTON No 2 business days prior to cutoff 2016/11/23 14:20 (ET) 2016/11/22 8:00 (ET) 2016/12/07 14:20 (ET) 2016/12/06 8:00 (ET)
NYBOT DX 201603 US DOLLAR INDEX No 2 business days prior to cutoff 2016/03/14 10:16 (ET) 2016/03/11 8:00 (ET) 2016/03/14 10:16 (ET) 2016/03/11 8:00 (ET)
NYBOT DX 201606 US DOLLAR INDEX No 2 business days prior to cutoff 2016/06/13 10:16 (ET) 2016/06/10 8:00 (ET) 2016/06/13 10:16 (ET) 2016/06/10 8:00 (ET)
NYBOT DX 201609 US DOLLAR INDEX No 2 business days prior to cutoff 2016/09/19 10:16 (ET) 2016/09/16 8:00 (ET) 2016/09/19 10:16 (ET) 2016/09/16 8:00 (ET)
NYBOT DX 201612 US DOLLAR INDEX No 2 business days prior to cutoff 2016/12/19 10:16 (ET) 2016/12/16 8:00 (ET) 2016/12/19 10:16 (ET) 2016/12/16 8:00 (ET)
NYBOT KC 201603 COFFEE C No 2 business days prior to cutoff 2016/02/19 13:30 (ET) 2016/02/18 8:00 (ET) 2016/03/18 13:25 (ET) 2016/03/17 8:00 (ET)
NYBOT KC 201605 COFFEE C No 2 business days prior to cutoff 2016/04/21 13:30 (ET) 2016/04/20 8:00 (ET) 2016/05/18 13:25 (ET) 2016/05/17 8:00 (ET)
NYBOT KC 201607 COFFEE C No 2 business days prior to cutoff 2016/06/22 13:30 (ET) 2016/06/21 8:00 (ET) 2016/07/19 13:25 (ET) 2016/07/18 8:00 (ET)
NYBOT KC 201609 COFFEE C No 2 business days prior to cutoff 2016/08/23 13:30 (ET) 2016/08/22 8:00 (ET) 2016/09/20 13:25 (ET) 2016/09/19 8:00 (ET)
NYBOT KC 201612 COFFEE C No 2 business days prior to cutoff 2016/11/21 13:30 (ET) 2016/11/18 8:00 (ET) 2016/12/19 13:25 (ET) 2016/12/16 8:00 (ET)
NYBOT OJ 201603 FL ORANGE JUICE No 2 business days prior to cutoff 2016/03/01 14:00 (ET) 2016/02/29 8:00 (ET) 2016/03/10 14:00 (ET) 2016/03/09 8:00 (ET)
NYBOT OJ 201605 FL ORANGE JUICE No 2 business days prior to cutoff 2016/05/02 14:00 (ET) 2016/04/29 8:00 (ET) 2016/05/10 14:00 (ET) 2016/05/09 8:00 (ET)
NYBOT OJ 201607 FL ORANGE JUICE No 2 business days prior to cutoff 2016/07/01 14:00 (ET) 2016/06/30 8:00 (ET) 2016/07/11 14:00 (ET) 2016/07/08 8:00 (ET)
NYBOT OJ 201609 FL ORANGE JUICE No 2 business days prior to cutoff 2016/09/01 14:00 (ET) 2016/08/31 8:00 (ET) 2016/09/12 14:00 (ET) 2016/09/09 8:00 (ET)
NYBOT OJ 201611 FL ORANGE JUICE No 2 business days prior to cutoff 2016/11/01 14:00 (ET) 2016/10/31 8:00 (ET) 2016/11/09 14:00 (ET) 2016/11/08 8:00 (ET)
NYBOT OJ 201701 FL ORANGE JUICE No 2 business days prior to cutoff 2017/01/03 14:00 (ET) 2017/01/02 8:00 (ET) 2017/01/10 14:00 (ET) 2017/01/09 8:00 (ET)
NYBOT SB 201603 SUGAR #11 WORLD No 2 business days prior to cutoff 2016/02/29 12:55 (ET) 2016/02/26 8:10 (ET) 2016/02/29 12:55 (ET) 2016/02/26 8:10 (ET)
NYBOT SB 201605 SUGAR #11 WORLD No 2 business days prior to cutoff 2016/04/29 12:55 (ET) 2016/04/28 8:10 (ET) 2016/04/29 12:55 (ET) 2016/04/28 8:10 (ET)
NYBOT SB 201607 SUGAR #11 WORLD No 2 business days prior to cutoff 2016/06/30 12:55 (ET) 2016/06/29 8:10 (ET) 2016/06/30 12:55 (ET) 2016/06/29 8:10 (ET)
NYBOT SB 201610 SUGAR #11 WORLD No 2 business days prior to cutoff 2016/09/30 12:55 (ET) 2016/09/29 8:10 (ET) 2016/09/30 12:55 (ET) 2016/09/29 8:10 (ET)
NYBOT SF 201605 Sugar #16 DMSTC No 2 business days prior to cutoff 2016/04/08 12:45 (ET) 2016/04/07 9:00 (ET) 2016/04/08 12:45 (ET) 2016/04/07 9:00 (ET)
NYBOT SF 201607 Sugar #16 DMSTC No 2 business days prior to cutoff 2016/06/08 12:45 (ET) 2016/06/07 9:00 (ET) 2016/06/08 12:45 (ET) 2016/06/07 9:00 (ET)
NYBOT SF 201609 Sugar #16 DMSTC No 2 business days prior to cutoff 2016/08/08 12:45 (ET) 2016/08/05 9:00 (ET) 2016/08/08 12:45 (ET) 2016/08/05 9:00 (ET)
NYBOT SF 201611 Sugar #16 DMSTC No 2 business days prior to cutoff 2016/10/07 12:45 (ET) 2016/10/06 9:00 (ET) 2016/10/07 12:45 (ET) 2016/10/06 9:00 (ET)
NYBOT SF 201701 Sugar #16 DMSTC No 2 business days prior to cutoff 2016/12/08 12:45 (ET) 2016/12/07 9:00 (ET) 2016/12/08 12:45 (ET) 2016/12/07 9:00 (ET)
NYBOT SF 201703 Sugar #16 DMSTC No 2 business days prior to cutoff 2017/02/08 12:45 (ET) 2017/02/07 9:00 (ET) 2017/02/08 12:45 (ET) 2017/02/07 9:00 (ET)
NYMEX CL 201606 Crude oil No 2 business days prior to cutoff 2016/05/20 16:00 (ET) 2016/05/19 9:00 (ET) 2016/05/20 16:00 (ET) 2016/05/19 9:00 (ET)
NYMEX CL 201612 Crude oil No 2 business days prior to cutoff 2016/11/21 16:00 (ET) 2016/11/18 9:00 (ET) 2016/11/21 16:00 (ET) 2016/11/18 9:00 (ET)
NYMEX CL 201609 Crude oil No 2 business days prior to cutoff 2016/08/22 16:00 (ET) 2016/08/19 9:00 (ET) 2016/08/22 16:00 (ET) 2016/08/19 9:00 (ET)
NYMEX CL 201603 Crude oil No 2 business days prior to cutoff 2016/02/22 16:00 (ET) 2016/02/19 9:00 (ET) 2016/02/22 16:00 (ET) 2016/02/19 9:00 (ET)
NYMEX CL 201611 Crude oil No 2 business days prior to cutoff 2016/10/20 16:00 (ET) 2016/10/19 9:00 (ET) 2016/10/20 16:00 (ET) 2016/10/19 9:00 (ET)
NYMEX CL 201605 Crude oil No 2 business days prior to cutoff 2016/04/20 16:00 (ET) 2016/04/19 9:00 (ET) 2016/04/20 16:00 (ET) 2016/04/19 9:00 (ET)
NYMEX CL 201608 Crude oil No 2 business days prior to cutoff 2016/07/20 16:00 (ET) 2016/07/19 9:00 (ET) 2016/07/20 16:00 (ET) 2016/07/19 9:00 (ET)
NYMEX CL 201610 Crude oil No 2 business days prior to cutoff 2016/09/20 16:00 (ET) 2016/09/19 9:00 (ET) 2016/09/20 16:00 (ET) 2016/09/19 9:00 (ET)
NYMEX CL 201604 Crude oil No 2 business days prior to cutoff 2016/03/21 16:00 (ET) 2016/03/18 9:00 (ET) 2016/03/21 16:00 (ET) 2016/03/18 9:00 (ET)
NYMEX CL 201607 Crude oil No 2 business days prior to cutoff 2016/06/21 16:00 (ET) 2016/06/20 9:00 (ET) 2016/06/21 16:00 (ET) 2016/06/20 9:00 (ET)
NYMEX CL 201703 Crude oil No 2 business days prior to cutoff 2017/02/21 16:00 (ET) 2017/02/20 9:00 (ET) 2017/02/21 16:00 (ET) 2017/02/20 9:00 (ET)
NYMEX CL 201702 Crude oil No 2 business days prior to cutoff 2017/01/20 16:00 (ET) 2017/01/19 9:00 (ET) 2017/01/20 16:00 (ET) 2017/01/19 9:00 (ET)
NYMEX CL 201701 Crude oil No 2 business days prior to cutoff 2016/12/20 16:00 (ET) 2016/12/19 9:00 (ET) 2016/12/20 16:00 (ET) 2016/12/19 9:00 (ET)
NYMEX GC 201602 Gold No 2 business days prior to cutoff 2016/01/28 16:00 (ET) 2016/01/27 8:20 (ET) 2016/02/25 16:00 (ET) 2016/02/24 8:20 (ET)
NYMEX GC 201604 Gold No 2 business days prior to cutoff 2016/03/30 16:00 (ET) 2016/03/29 8:20 (ET) 2016/04/27 16:00 (ET) 2016/04/26 8:20 (ET)
NYMEX GC 201608 Gold No 2 business days prior to cutoff 2016/07/28 16:00 (ET) 2016/07/27 8:20 (ET) 2016/08/29 16:00 (ET) 2016/08/26 8:20 (ET)
NYMEX GC 201610 Gold No 2 business days prior to cutoff 2016/09/29 16:00 (ET) 2016/09/28 8:20 (ET) 2016/10/27 16:00 (ET) 2016/10/26 8:20 (ET)
NYMEX GC 201603 Gold No 2 business days prior to cutoff 2016/02/26 16:00 (ET) 2016/02/25 8:20 (ET) 2016/03/29 16:00 (ET) 2016/03/28 8:20 (ET)
NYMEX GC 201606 Gold No 2 business days prior to cutoff 2016/05/27 16:00 (ET) 2016/05/26 8:20 (ET) 2016/06/28 16:00 (ET) 2016/06/27 8:20 (ET)
NYMEX GC 201612 Gold No 2 business days prior to cutoff 2016/11/29 16:00 (ET) 2016/11/28 8:20 (ET) 2016/12/28 16:00 (ET) 2016/12/27 8:20 (ET)
NYMEX HG 201602 Copper No 2 business days prior to cutoff 2016/01/28 16:00 (ET) 2016/01/27 8:10 (ET) 2016/02/25 16:00 (ET) 2016/02/24 8:10 (ET)
NYMEX HG 201604 Copper No 2 business days prior to cutoff 2016/03/30 16:00 (ET) 2016/03/29 8:10 (ET) 2016/04/27 16:00 (ET) 2016/04/26 8:10 (ET)
NYMEX HG 201606 Copper No 2 business days prior to cutoff 2016/05/27 16:00 (ET) 2016/05/26 8:10 (ET) 2016/06/28 16:00 (ET) 2016/06/27 8:10 (ET)
NYMEX HG 201608 Copper No 2 business days prior to cutoff 2016/07/28 16:00 (ET) 2016/07/27 8:10 (ET) 2016/08/29 16:00 (ET) 2016/08/26 8:10 (ET)
NYMEX HG 201610 Copper No 2 business days prior to cutoff 2016/09/29 16:00 (ET) 2016/09/28 8:10 (ET) 2016/10/27 16:00 (ET) 2016/10/26 8:10 (ET)
NYMEX HG 201611 Copper No 2 business days prior to cutoff 2016/10/28 16:00 (ET) 2016/10/27 8:10 (ET) 2016/11/28 16:00 (ET) 2016/11/25 8:10 (ET)
NYMEX HG 201701 Copper No 2 business days prior to cutoff 2016/12/29 16:00 (ET) 2016/12/28 8:10 (ET) 2017/01/27 16:00 (ET) 2017/01/26 8:10 (ET)
NYMEX HG 201603 Copper No 2 business days prior to cutoff 2016/02/26 16:00 (ET) 2016/02/25 8:10 (ET) 2016/03/29 16:00 (ET) 2016/03/28 8:10 (ET)
NYMEX HG 201605 Copper No 2 business days prior to cutoff 2016/04/28 16:00 (ET) 2016/04/27 8:10 (ET) 2016/05/26 16:00 (ET) 2016/05/25 8:10 (ET)
NYMEX HG 201607 Copper No 2 business days prior to cutoff 2016/06/29 16:00 (ET) 2016/06/28 8:10 (ET) 2016/07/27 16:00 (ET) 2016/07/26 8:10 (ET)
NYMEX HG 201609 Copper No 2 business days prior to cutoff 2016/08/30 16:00 (ET) 2016/08/29 8:10 (ET) 2016/09/28 16:00 (ET) 2016/09/27 8:10 (ET)
NYMEX HG 201612 Copper No 2 business days prior to cutoff 2016/11/29 16:00 (ET) 2016/11/28 8:10 (ET) 2016/12/28 16:00 (ET) 2016/12/27 8:10 (ET)
NYMEX HO 201605 Heating Oil No 2 business days prior to cutoff 2016/04/29 16:00 (ET) 2016/04/28 9:00 (ET) 2016/04/29 16:00 (ET) 2016/04/28 9:00 (ET)
NYMEX HO 201607 Heating Oil No 2 business days prior to cutoff 2016/06/30 16:00 (ET) 2016/06/29 9:00 (ET) 2016/06/30 16:00 (ET) 2016/06/29 9:00 (ET)
NYMEX HO 201610 Heating Oil No 2 business days prior to cutoff 2016/09/30 16:00 (ET) 2016/09/29 9:00 (ET) 2016/09/30 16:00 (ET) 2016/09/29 9:00 (ET)
NYMEX HO 201701 Heating Oil No 2 business days prior to cutoff 2016/12/30 16:00 (ET) 2016/12/29 9:00 (ET) 2016/12/30 16:00 (ET) 2016/12/29 9:00 (ET)
NYMEX HO 201603 Heating Oil No 2 business days prior to cutoff 2016/02/29 16:00 (ET) 2016/02/26 9:00 (ET) 2016/02/29 16:00 (ET) 2016/02/26 9:00 (ET)
NYMEX HO 201612 Heating Oil No 2 business days prior to cutoff 2016/11/30 16:00 (ET) 2016/11/29 9:00 (ET) 2016/11/30 16:00 (ET) 2016/11/29 9:00 (ET)
NYMEX HO 201609 Heating Oil No 2 business days prior to cutoff 2016/08/31 16:00 (ET) 2016/08/30 9:00 (ET) 2016/08/31 16:00 (ET) 2016/08/30 9:00 (ET)
NYMEX HO 201606 Heating Oil No 2 business days prior to cutoff 2016/05/31 16:00 (ET) 2016/05/30 9:00 (ET) 2016/05/31 16:00 (ET) 2016/05/30 9:00 (ET)
NYMEX HO 201604 Heating Oil No 2 business days prior to cutoff 2016/03/31 16:00 (ET) 2016/03/30 9:00 (ET) 2016/03/31 16:00 (ET) 2016/03/30 9:00 (ET)
NYMEX HO 201611 Heating Oil No 2 business days prior to cutoff 2016/10/31 16:00 (ET) 2016/10/28 9:00 (ET) 2016/10/31 16:00 (ET) 2016/10/28 9:00 (ET)
NYMEX HO 201608 Heating Oil No 2 business days prior to cutoff 2016/07/29 16:00 (ET) 2016/07/28 9:00 (ET) 2016/07/29 16:00 (ET) 2016/07/28 9:00 (ET)
NYMEX HO 201702 Heating Oil No 2 business days prior to cutoff 2017/01/31 16:00 (ET) 2017/01/30 9:00 (ET) 2017/01/31 16:00 (ET) 2017/01/30 9:00 (ET)
NYMEX MGC 201602 E-Micro Gold No 2 business days prior to cutoff 2016/01/28 16:00 (ET) 2016/01/27 8:30 (ET) 2016/02/25 16:00 (ET) 2016/02/24 8:30 (ET)
NYMEX MGC 201604 E-Micro Gold No 2 business days prior to cutoff 2016/03/30 16:00 (ET) 2016/03/29 8:30 (ET) 2016/04/27 16:00 (ET) 2016/04/26 8:30 (ET)
NYMEX MGC 201606 E-Micro Gold No 2 business days prior to cutoff 2016/05/27 16:00 (ET) 2016/05/26 8:30 (ET) 2016/06/28 16:00 (ET) 2016/06/27 8:30 (ET)
NYMEX MGC 201608 E-Micro Gold No 2 business days prior to cutoff 2016/07/28 16:00 (ET) 2016/07/27 8:30 (ET) 2016/08/29 16:00 (ET) 2016/08/26 8:30 (ET)
NYMEX MGC 201610 E-Micro Gold No 2 business days prior to cutoff 2016/09/29 16:00 (ET) 2016/09/28 8:30 (ET) 2016/10/27 16:00 (ET) 2016/10/26 8:30 (ET)
NYMEX MGC 201612 E-Micro Gold No 2 business days prior to cutoff 2016/11/29 16:00 (ET) 2016/11/28 8:30 (ET) 2016/12/28 16:00 (ET) 2016/12/27 8:30 (ET)
NYMEX NG 201603 Natural gas No 1 business day prior to cutoff 2016/02/25 16:00 (ET) 2016/02/25 9:00 (ET) 2016/02/25 16:00 (ET) 2016/02/25 9:00 (ET)
NYMEX NG 201604 Natural gas No 1 business day prior to cutoff 2016/03/29 16:00 (ET) 2016/03/29 9:00 (ET) 2016/03/29 16:00 (ET) 2016/03/29 9:00 (ET)
NYMEX NG 201605 Natural gas No 1 business day prior to cutoff 2016/04/27 16:00 (ET) 2016/04/27 9:00 (ET) 2016/04/27 16:00 (ET) 2016/04/27 9:00 (ET)
NYMEX NG 201606 Natural gas No 1 business day prior to cutoff 2016/05/26 16:00 (ET) 2016/05/26 9:00 (ET) 2016/05/26 16:00 (ET) 2016/05/26 9:00 (ET)
NYMEX NG 201607 Natural gas No 1 business day prior to cutoff 2016/06/28 16:00 (ET) 2016/06/28 9:00 (ET) 2016/06/28 16:00 (ET) 2016/06/28 9:00 (ET)
NYMEX NG 201608 Natural gas No 1 business day prior to cutoff 2016/07/27 16:00 (ET) 2016/07/27 9:00 (ET) 2016/07/27 16:00 (ET) 2016/07/27 9:00 (ET)
NYMEX NG 201609 Natural gas No 1 business day prior to cutoff 2016/08/29 16:00 (ET) 2016/08/29 9:00 (ET) 2016/08/29 16:00 (ET) 2016/08/29 9:00 (ET)
NYMEX NG 201610 Natural gas No 1 business day prior to cutoff 2016/09/28 16:00 (ET) 2016/09/28 9:00 (ET) 2016/09/28 16:00 (ET) 2016/09/28 9:00 (ET)
NYMEX NG 201611 Natural gas No 1 business day prior to cutoff 2016/10/27 16:00 (ET) 2016/10/27 9:00 (ET) 2016/10/27 16:00 (ET) 2016/10/27 9:00 (ET)
NYMEX NG 201612 Natural gas No 1 business day prior to cutoff 2016/11/28 16:00 (ET) 2016/11/28 9:00 (ET) 2016/11/28 16:00 (ET) 2016/11/28 9:00 (ET)
NYMEX NG 201701 Natural gas No 1 business day prior to cutoff 2016/12/28 16:00 (ET) 2016/12/28 9:00 (ET) 2016/12/28 16:00 (ET) 2016/12/28 9:00 (ET)
NYMEX NG 201702 Natural gas No 1 business day prior to cutoff 2017/01/27 16:00 (ET) 2017/01/27 9:00 (ET) 2017/01/27 16:00 (ET) 2017/01/27 9:00 (ET)
NYMEX PA 201603 Palladium No 2 business days prior to cutoff 2016/02/26 16:00 (ET) 2016/02/25 9:30 (ET) 2016/03/29 16:00 (ET) 2016/03/28 9:30 (ET)
NYMEX PA 201606 Palladium No 2 business days prior to cutoff 2016/05/27 16:00 (ET) 2016/05/26 9:30 (ET) 2016/06/28 16:00 (ET) 2016/06/27 9:30 (ET)
NYMEX PA 201609 Palladium No 2 business days prior to cutoff 2016/08/30 16:00 (ET) 2016/08/29 9:30 (ET) 2016/09/28 16:00 (ET) 2016/09/27 9:30 (ET)
NYMEX PA 201612 Palladium No 2 business days prior to cutoff 2016/11/29 16:00 (ET) 2016/11/28 9:30 (ET) 2016/12/28 16:00 (ET) 2016/12/27 9:30 (ET)
NYMEX PA 201602 Palladium No 2 business days prior to cutoff 2016/01/28 16:00 (ET) 2016/01/27 9:30 (ET) 2016/02/25 16:00 (ET) 2016/02/24 9:30 (ET)
NYMEX PA 201604 Palladium No 2 business days prior to cutoff 2016/03/30 16:00 (ET) 2016/03/29 9:30 (ET) 2016/04/27 16:00 (ET) 2016/04/26 9:30 (ET)
NYMEX PL 201604 Platinum No 2 business days prior to cutoff 2016/03/30 16:00 (ET) 2016/03/29 9:30 (ET) 2016/04/27 16:00 (ET) 2016/04/26 9:30 (ET)
NYMEX PL 201607 Platinum No 2 business days prior to cutoff 2016/06/29 16:00 (ET) 2016/06/28 9:30 (ET) 2016/07/27 16:00 (ET) 2016/07/26 9:30 (ET)
NYMEX PL 201610 Platinum No 2 business days prior to cutoff 2016/09/29 16:00 (ET) 2016/09/28 9:30 (ET) 2016/10/27 16:00 (ET) 2016/10/26 9:30 (ET)
NYMEX PL 201701 Platinum No 2 business days prior to cutoff 2016/12/29 16:00 (ET) 2016/12/28 9:30 (ET) 2017/01/27 16:00 (ET) 2017/01/26 9:30 (ET)
NYMEX PL 201602 Platinum No 2 business days prior to cutoff 2016/01/28 16:00 (ET) 2016/01/27 9:30 (ET) 2016/02/25 16:00 (ET) 2016/02/24 9:30 (ET)
NYMEX PL 201603 Platinum No 2 business days prior to cutoff 2016/02/26 16:00 (ET) 2016/02/25 9:30 (ET) 2016/03/29 16:00 (ET) 2016/03/28 9:30 (ET)
NYMEX QLD 201702 Central Appalachian Coal No 2 business days prior to cutoff 2017/01/26 16:00 (ET) 2017/01/25 9:30 (ET) 2017/01/26 16:00 (ET) 2017/01/25 9:30 (ET)
NYMEX QLD 201701 Central Appalachian Coal No 2 business days prior to cutoff 2016/12/27 16:00 (ET) 2016/12/26 9:30 (ET) 2016/12/27 16:00 (ET) 2016/12/26 9:30 (ET)
NYMEX QLD 201605 Central Appalachian Coal No 2 business days prior to cutoff 2016/04/26 16:00 (ET) 2016/04/25 9:30 (ET) 2016/04/26 16:00 (ET) 2016/04/25 9:30 (ET)
NYMEX QLD 201604 Central Appalachian Coal No 2 business days prior to cutoff 2016/03/28 16:00 (ET) 2016/03/25 9:30 (ET) 2016/03/28 16:00 (ET) 2016/03/25 9:30 (ET)
NYMEX QLD 201609 Central Appalachian Coal No 2 business days prior to cutoff 2016/08/26 16:00 (ET) 2016/08/25 9:30 (ET) 2016/08/26 16:00 (ET) 2016/08/25 9:30 (ET)
NYMEX QLD 201603 Central Appalachian Coal No 2 business days prior to cutoff 2016/02/24 16:00 (ET) 2016/02/23 9:30 (ET) 2016/02/24 16:00 (ET) 2016/02/23 9:30 (ET)
NYMEX QLD 201612 Central Appalachian Coal No 2 business days prior to cutoff 2016/11/25 16:00 (ET) 2016/11/24 9:30 (ET) 2016/11/25 16:00 (ET) 2016/11/24 9:30 (ET)
NYMEX QLD 201608 Central Appalachian Coal No 2 business days prior to cutoff 2016/07/26 16:00 (ET) 2016/07/25 9:30 (ET) 2016/07/26 16:00 (ET) 2016/07/25 9:30 (ET)
NYMEX QLD 201611 Central Appalachian Coal No 2 business days prior to cutoff 2016/10/26 16:00 (ET) 2016/10/25 9:30 (ET) 2016/10/26 16:00 (ET) 2016/10/25 9:30 (ET)
NYMEX QLD 201606 Central Appalachian Coal No 2 business days prior to cutoff 2016/05/25 16:00 (ET) 2016/05/24 9:30 (ET) 2016/05/25 16:00 (ET) 2016/05/24 9:30 (ET)
NYMEX QLD 201610 Central Appalachian Coal No 2 business days prior to cutoff 2016/09/27 16:00 (ET) 2016/09/26 9:30 (ET) 2016/09/27 16:00 (ET) 2016/09/26 9:30 (ET)
NYMEX QLD 201607 Central Appalachian Coal No 2 business days prior to cutoff 2016/06/27 16:00 (ET) 2016/06/24 9:30 (ET) 2016/06/27 16:00 (ET) 2016/06/24 9:30 (ET)
NYMEX RB 201603 RBOB Gasoline No 2 business days prior to cutoff 2016/02/29 16:00 (ET) 2016/02/26 9:00 (ET) 2016/02/29 16:00 (ET) 2016/02/26 9:00 (ET)
NYMEX RB 201604 RBOB Gasoline No 2 business days prior to cutoff 2016/03/31 16:00 (ET) 2016/03/30 9:00 (ET) 2016/03/31 16:00 (ET) 2016/03/30 9:00 (ET)
NYMEX RB 201605 RBOB Gasoline No 2 business days prior to cutoff 2016/04/29 16:00 (ET) 2016/04/28 9:00 (ET) 2016/04/29 16:00 (ET) 2016/04/28 9:00 (ET)
NYMEX RB 201606 RBOB Gasoline No 2 business days prior to cutoff 2016/05/31 16:00 (ET) 2016/05/30 9:00 (ET) 2016/05/31 16:00 (ET) 2016/05/30 9:00 (ET)
NYMEX RB 201607 RBOB Gasoline No 2 business days prior to cutoff 2016/06/30 16:00 (ET) 2016/06/29 9:00 (ET) 2016/06/30 16:00 (ET) 2016/06/29 9:00 (ET)
NYMEX RB 201608 RBOB Gasoline No 2 business days prior to cutoff 2016/07/29 16:00 (ET) 2016/07/28 9:00 (ET) 2016/07/29 16:00 (ET) 2016/07/28 9:00 (ET)
NYMEX RB 201609 RBOB Gasoline No 2 business days prior to cutoff 2016/08/31 16:00 (ET) 2016/08/30 9:00 (ET) 2016/08/31 16:00 (ET) 2016/08/30 9:00 (ET)
NYMEX RB 201610 RBOB Gasoline No 2 business days prior to cutoff 2016/09/30 16:00 (ET) 2016/09/29 9:00 (ET) 2016/09/30 16:00 (ET) 2016/09/29 9:00 (ET)
NYMEX RB 201611 RBOB Gasoline No 2 business days prior to cutoff 2016/10/31 16:00 (ET) 2016/10/28 9:00 (ET) 2016/10/31 16:00 (ET) 2016/10/28 9:00 (ET)
NYMEX RB 201612 RBOB Gasoline No 2 business days prior to cutoff 2016/11/30 16:00 (ET) 2016/11/29 9:00 (ET) 2016/11/30 16:00 (ET) 2016/11/29 9:00 (ET)
NYMEX RB 201701 RBOB Gasoline No 2 business days prior to cutoff 2016/12/30 16:00 (ET) 2016/12/29 9:00 (ET) 2016/12/30 16:00 (ET) 2016/12/29 9:00 (ET)
NYMEX RB 201702 RBOB Gasoline No 2 business days prior to cutoff 2017/01/31 16:00 (ET) 2017/01/30 9:00 (ET) 2017/01/31 16:00 (ET) 2017/01/30 9:00 (ET)
NYMEX SI 201603 Silver No 2 business days prior to cutoff 2016/02/26 16:00 (ET) 2016/02/25 8:25 (ET) 2016/03/29 16:00 (ET) 2016/03/28 8:25 (ET)
NYMEX SI 201605 Silver No 2 business days prior to cutoff 2016/04/28 16:00 (ET) 2016/04/27 8:25 (ET) 2016/05/26 16:00 (ET) 2016/05/25 8:25 (ET)
NYMEX SI 201609 Silver No 2 business days prior to cutoff 2016/08/30 16:00 (ET) 2016/08/29 8:25 (ET) 2016/09/28 16:00 (ET) 2016/09/27 8:25 (ET)
NYMEX SI 201701 Silver No 2 business days prior to cutoff 2016/12/29 16:00 (ET) 2016/12/28 8:25 (ET) 2017/01/27 16:00 (ET) 2017/01/26 8:25 (ET)
NYMEX SI 201602 Silver No 2 business days prior to cutoff 2016/01/28 16:00 (ET) 2016/01/27 8:25 (ET) 2016/02/25 16:00 (ET) 2016/02/24 8:25 (ET)
NYMEX SI 201604 Silver No 2 business days prior to cutoff 2016/03/30 16:00 (ET) 2016/03/29 8:25 (ET) 2016/04/27 16:00 (ET) 2016/04/26 8:25 (ET)
NYMEX SI 201607 Silver No 2 business days prior to cutoff 2016/06/29 16:00 (ET) 2016/06/28 8:25 (ET) 2016/07/27 16:00 (ET) 2016/07/26 8:25 (ET)
NYMEX SI 201612 Silver No 2 business days prior to cutoff 2016/11/29 16:00 (ET) 2016/11/28 8:25 (ET) 2016/12/28 16:00 (ET) 2016/12/27 8:25 (ET)
NYMEX SIL 201603 Silver No 2 business days prior to cutoff 2016/02/26 16:00 (ET) 2016/02/25 8:25 (ET) 2016/03/29 16:00 (ET) 2016/03/28 8:25 (ET)
NYMEX SIL 201605 Silver No 2 business days prior to cutoff 2016/04/28 16:00 (ET) 2016/04/27 8:25 (ET) 2016/05/26 16:00 (ET) 2016/05/25 8:25 (ET)
NYMEX SIL 201607 Silver No 2 business days prior to cutoff 2016/06/29 16:00 (ET) 2016/06/28 8:25 (ET) 2016/07/27 16:00 (ET) 2016/07/26 8:25 (ET)
NYMEX SIL 201609 Silver No 2 business days prior to cutoff 2016/08/30 16:00 (ET) 2016/08/29 8:25 (ET) 2016/09/28 16:00 (ET) 2016/09/27 8:25 (ET)
NYMEX SIL 201602 Silver No 2 business days prior to cutoff 2016/01/28 16:00 (ET) 2016/01/27 8:25 (ET) 2016/02/25 16:00 (ET) 2016/02/24 8:25 (ET)
NYMEX SIL 201612 Silver No 2 business days prior to cutoff 2016/11/29 16:00 (ET) 2016/11/28 8:25 (ET) 2016/12/28 16:00 (ET) 2016/12/27 8:25 (ET)
NYMEX SIL 201701 Silver No 2 business days prior to cutoff 2016/12/29 16:00 (ET) 2016/12/28 8:25 (ET) 2017/01/27 16:00 (ET) 2017/01/26 8:25 (ET)
NYMEX SIL 201604 Silver No 2 business days prior to cutoff 2016/03/30 16:00 (ET) 2016/03/29 8:25 (ET) 2016/04/27 16:00 (ET) 2016/04/26 8:25 (ET)
NYSELIFFE YG 201602 MINI NY GOLD No 2 business days prior to cutoff 2016/01/28 15:15 (ET) 2016/01/27 8:30 (ET) 2016/02/25 01:30 (ET) 2016/02/24 8:30 (ET)
NYSELIFFE YG 201604 MINI NY GOLD No 2 business days prior to cutoff 2016/03/30 15:15 (ET) 2016/03/29 8:30 (ET) 2016/04/27 01:30 (ET) 2016/04/26 8:30 (ET)
NYSELIFFE YG 201608 MINI NY GOLD No 2 business days prior to cutoff 2016/07/28 15:15 (ET) 2016/07/27 8:30 (ET) 2016/08/29 01:30 (ET) 2016/08/26 8:30 (ET)
NYSELIFFE YG 201610 MINI NY GOLD No 2 business days prior to cutoff 2016/09/29 15:15 (ET) 2016/09/28 8:30 (ET) 2016/10/27 01:30 (ET) 2016/10/26 8:30 (ET)
NYSELIFFE YG 201603 MINI NY GOLD No 2 business days prior to cutoff 2016/02/26 15:15 (ET) 2016/02/25 8:30 (ET) 2016/03/29 01:30 (ET) 2016/03/28 8:30 (ET)
NYSELIFFE YG 201605 MINI NY GOLD No 2 business days prior to cutoff 2016/04/28 15:15 (ET) 2016/04/27 8:30 (ET) 2016/05/26 01:30 (ET) 2016/05/25 8:30 (ET)
NYSELIFFE YG 201606 MINI NY GOLD No 2 business days prior to cutoff 2016/05/27 15:15 (ET) 2016/05/26 8:30 (ET) 2016/06/28 01:30 (ET) 2016/06/27 8:30 (ET)
NYSELIFFE YG 201612 MINI NY GOLD No 2 business days prior to cutoff 2016/11/29 15:15 (ET) 2016/11/28 8:30 (ET) 2016/12/28 01:30 (ET) 2016/12/27 8:30 (ET)
NYSELIFFE YI 201603 MINI NY SILVER No 2 business days prior to cutoff 2016/02/26 15:15 (ET) 2016/02/25 8:30 (ET) 2016/03/29 01:30 (ET) 2016/03/28 8:30 (ET)
NYSELIFFE YI 201605 MINI NY SILVER No 2 business days prior to cutoff 2016/04/28 15:15 (ET) 2016/04/27 8:30 (ET) 2016/05/26 01:30 (ET) 2016/05/25 8:30 (ET)
NYSELIFFE YI 201609 MINI NY SILVER No 2 business days prior to cutoff 2016/08/30 15:15 (ET) 2016/08/29 8:30 (ET) 2016/09/28 01:30 (ET) 2016/09/27 8:30 (ET)
NYSELIFFE YI 201701 MINI NY SILVER No 2 business days prior to cutoff 2016/12/29 15:15 (ET) 2016/12/28 8:30 (ET) 2017/01/27 01:30 (ET) 2017/01/26 8:30 (ET)
NYSELIFFE YI 201602 MINI NY SILVER No 2 business days prior to cutoff 2016/01/28 15:15 (ET) 2016/01/27 8:30 (ET) 2016/02/25 01:30 (ET) 2016/02/24 8:30 (ET)
NYSELIFFE YI 201604 MINI NY SILVER No 2 business days prior to cutoff 2016/03/30 15:15 (ET) 2016/03/29 8:30 (ET) 2016/04/27 01:30 (ET) 2016/04/26 8:30 (ET)
NYSELIFFE YI 201607 MINI NY SILVER No 2 business days prior to cutoff 2016/06/29 15:15 (ET) 2016/06/28 8:30 (ET) 2016/07/27 01:30 (ET) 2016/07/26 8:30 (ET)
NYSELIFFE YI 201612 MINI NY SILVER No 2 business days prior to cutoff 2016/11/29 15:15 (ET) 2016/11/28 8:30 (ET) 2016/12/28 01:30 (ET) 2016/12/27 8:30 (ET)
NYSELIFFE ZG 201602 GOLD No 2 business days prior to cutoff 2016/01/28 15:15 (ET) 2016/01/27 8:30 (ET) 2016/02/25 13:30 (ET) 2016/02/24 8:30 (ET)
NYSELIFFE ZG 201604 GOLD No 2 business days prior to cutoff 2016/03/30 15:15 (ET) 2016/03/29 8:30 (ET) 2016/04/27 13:30 (ET) 2016/04/26 8:30 (ET)
NYSELIFFE ZG 201608 GOLD No 2 business days prior to cutoff 2016/07/28 15:15 (ET) 2016/07/27 8:30 (ET) 2016/08/29 13:30 (ET) 2016/08/26 8:30 (ET)
NYSELIFFE ZG 201610 GOLD No 2 business days prior to cutoff 2016/09/29 15:15 (ET) 2016/09/28 8:30 (ET) 2016/10/27 13:30 (ET) 2016/10/26 8:30 (ET)
NYSELIFFE ZG 201603 GOLD No 2 business days prior to cutoff 2016/02/26 15:15 (ET) 2016/02/25 8:30 (ET) 2016/03/29 13:30 (ET) 2016/03/28 8:30 (ET)
NYSELIFFE ZG 201605 GOLD No 2 business days prior to cutoff 2016/04/28 15:15 (ET) 2016/04/27 8:30 (ET) 2016/05/26 13:30 (ET) 2016/05/25 8:30 (ET)
NYSELIFFE ZG 201606 GOLD No 2 business days prior to cutoff 2016/05/27 15:15 (ET) 2016/05/26 8:30 (ET) 2016/06/28 13:30 (ET) 2016/06/27 8:30 (ET)
NYSELIFFE ZG 201612 GOLD No 2 business days prior to cutoff 2016/11/29 15:15 (ET) 2016/11/28 8:30 (ET) 2016/12/28 13:30 (ET) 2016/12/27 8:30 (ET)
NYSELIFFE ZI 201603 SILVER No 2 business days prior to cutoff 2016/02/26 15:15 (ET) 2016/02/25 8:30 (ET) 2016/03/29 01:30 (ET) 2016/03/28 8:30 (ET)
NYSELIFFE ZI 201605 SILVER No 2 business days prior to cutoff 2016/04/28 15:15 (ET) 2016/04/27 8:30 (ET) 2016/05/26 01:30 (ET) 2016/05/25 8:30 (ET)
NYSELIFFE ZI 201609 SILVER No 2 business days prior to cutoff 2016/08/30 15:15 (ET) 2016/08/29 8:30 (ET) 2016/09/28 01:30 (ET) 2016/09/27 8:30 (ET)
NYSELIFFE ZI 201701 SILVER No 2 business days prior to cutoff 2016/12/29 15:15 (ET) 2016/12/28 8:30 (ET) 2017/01/27 01:30 (ET) 2017/01/26 8:30 (ET)
NYSELIFFE ZI 201602 SILVER No 2 business days prior to cutoff 2016/01/28 15:15 (ET) 2016/01/27 8:30 (ET) 2016/02/25 01:30 (ET) 2016/02/24 8:30 (ET)
NYSELIFFE ZI 201604 SILVER No 2 business days prior to cutoff 2016/03/30 15:15 (ET) 2016/03/29 8:30 (ET) 2016/04/27 01:30 (ET) 2016/04/26 8:30 (ET)
NYSELIFFE ZI 201607 SILVER No 2 business days prior to cutoff 2016/06/29 15:15 (ET) 2016/06/28 8:30 (ET) 2016/07/27 01:30 (ET) 2016/07/26 8:30 (ET)
NYSELIFFE ZI 201612 SILVER No 2 business days prior to cutoff 2016/11/29 15:15 (ET) 2016/11/28 8:30 (ET) 2016/12/28 01:30 (ET) 2016/12/27 8:30 (ET)
OSE.JPN JGBL 201603 Japanese Government Bonds 10 years No 2 business days prior to cutoff 2016/03/14 15:02 2016/03/11 9:00 2016/03/14 15:02 2016/03/11 9:00
OSE.JPN JGBL 201606 Japanese Government Bonds 10 years No 2 business days prior to cutoff 2016/06/13 15:02 2016/06/10 9:00 2016/06/13 15:02 2016/06/10 9:00
OSE.JPN JGBL 201609 Japanese Government Bonds 10 years No 2 business days prior to cutoff 2016/09/12 15:02 2016/09/09 9:00 2016/09/12 15:02 2016/09/09 9:00
SGX TF 201603 SICOM Rubber No 2 business days prior to cutoff 2016/02/29 00:00 (ST) 2016/02/26 7:55 (ST) 2016/02/29 18:00 (ST) 2016/02/26 7:55 (ST)
SGX TF 201604 SICOM Rubber No 2 business days prior to cutoff 2016/03/31 00:00 (ST) 2016/03/30 7:55 (ST) 2016/03/31 18:00 (ST) 2016/03/30 7:55 (ST)
SGX TF 201605 SICOM Rubber No 2 business days prior to cutoff 2016/04/29 00:00 (ST) 2016/04/28 7:55 (ST) 2016/04/29 18:00 (ST) 2016/04/28 7:55 (ST)
SGX TF 201606 SICOM Rubber No 2 business days prior to cutoff 2016/05/31 00:00 (ST) 2016/05/30 7:55 (ST) 2016/05/31 18:00 (ST) 2016/05/30 7:55 (ST)
SGX TF 201607 SICOM Rubber No 2 business days prior to cutoff 2016/06/30 00:00 (ST) 2016/06/29 7:55 (ST) 2016/06/30 18:00 (ST) 2016/06/29 7:55 (ST)
SGX TF 201608 SICOM Rubber No 2 business days prior to cutoff 2016/07/29 00:00 (ST) 2016/07/28 7:55 (ST) 2016/07/29 18:00 (ST) 2016/07/28 7:55 (ST)
SGX TF 201609 SICOM Rubber No 2 business days prior to cutoff 2016/08/31 00:00 (ST) 2016/08/30 7:55 (ST) 2016/08/31 18:00 (ST) 2016/08/30 7:55 (ST)
SGX TF 201610 SICOM Rubber No 2 business days prior to cutoff 2016/09/30 00:00 (ST) 2016/09/29 7:55 (ST) 2016/09/30 18:00 (ST) 2016/09/29 7:55 (ST)
SGX TF 201611 SICOM Rubber No 2 business days prior to cutoff 2016/10/31 00:00 (ST) 2016/10/28 7:55 (ST) 2016/10/31 18:00 (ST) 2016/10/28 7:55 (ST)
SGX TF 201612 SICOM Rubber No 2 business days prior to cutoff 2016/11/30 00:00 (ST) 2016/11/29 7:55 (ST) 2016/11/30 18:00 (ST) 2016/11/29 7:55 (ST)
SGX TF 201701 SICOM Rubber No 2 business days prior to cutoff 2016/12/30 00:00 (ST) 2016/12/29 7:55 (ST) 2016/12/30 18:00 (ST) 2016/12/29 7:55 (ST)
SGX TF 201702 SICOM Rubber No 2 business days prior to cutoff 2017/01/31 00:00 (ST) 2017/01/30 7:55 (ST) 2017/01/31 18:00 (ST) 2017/01/30 7:55 (ST)
SGX UC 201603 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/03/14 11:00 (ST) 2016/03/11 7:40 (ST) 2016/03/14 11:00 (ST) 2016/03/11 7:40 (ST)
SGX UC 201606 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/06/13 11:00 (ST) 2016/06/10 7:40 (ST) 2016/06/13 11:00 (ST) 2016/06/10 7:40 (ST)
SGX UC 201609 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/09/19 11:00 (ST) 2016/09/16 7:40 (ST) 2016/09/19 11:00 (ST) 2016/09/16 7:40 (ST)
SGX UC 201612 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/12/19 11:00 (ST) 2016/12/16 7:40 (ST) 2016/12/19 11:00 (ST) 2016/12/16 7:40 (ST)
SGX UC 201604 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/04/18 11:00 (ST) 2016/04/15 7:40 (ST) 2016/04/18 11:00 (ST) 2016/04/15 7:40 (ST)
SGX UC 201605 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/05/16 11:00 (ST) 2016/05/13 7:40 (ST) 2016/05/16 11:00 (ST) 2016/05/13 7:40 (ST)
SGX UC 201607 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/07/18 11:00 (ST) 2016/07/15 7:40 (ST) 2016/07/18 11:00 (ST) 2016/07/15 7:40 (ST)
SGX UC 201608 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/08/15 11:00 (ST) 2016/08/12 7:40 (ST) 2016/08/15 11:00 (ST) 2016/08/12 7:40 (ST)
SGX UC 201610 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/10/17 11:00 (ST) 2016/10/14 7:40 (ST) 2016/10/17 11:00 (ST) 2016/10/14 7:40 (ST)
SGX UC 201611 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2016/11/14 11:00 (ST) 2016/11/11 7:40 (ST) 2016/11/14 11:00 (ST) 2016/11/11 7:40 (ST)
SGX UC 201701 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2017/01/16 11:00 (ST) 2017/01/13 7:40 (ST) 2017/01/16 11:00 (ST) 2017/01/13 7:40 (ST)
SGX UC 201702 US Dollar in offshore renmimbi Yes(1) 2 business days prior to cutoff 2017/02/13 11:00 (ST) 2017/02/10 7:40 (ST) 2017/02/13 11:00 (ST) 2017/02/10 7:40 (ST)
SNFE IR 201603 90 day bank accepted bill No 2 business days prior to cutoff 2016/03/10 12:00 2016/03/09 8:28 2016/03/10 12:00 2016/03/09 8:28
SNFE IR 201606 90 day bank accepted bill No 2 business days prior to cutoff 2016/06/09 12:00 2016/06/08 8:28 2016/06/09 12:00 2016/06/08 8:28
SNFE IR 201609 90 day bank accepted bill No 2 business days prior to cutoff 2016/09/08 12:00 2016/09/07 8:28 2016/09/08 12:00 2016/09/07 8:28
SNFE IR 201612 90 day bank accepted bill No 2 business days prior to cutoff 2016/12/08 12:00 2016/12/07 8:28 2016/12/08 12:00 2016/12/07 8:28
SNFE UB 201701 Feed Barley No 2 business days prior to cutoff 2017/01/03 16:30 2017/01/02 11:00 2017/01/19 12:00 2017/01/18 11:00
SNFE UB 201603 Feed Barley No 2 business days prior to cutoff 2016/03/01 16:30 2016/02/29 11:00 2016/03/17 12:00 2016/03/16 11:00
SNFE UB 201605 Feed Barley No 2 business days prior to cutoff 2016/05/02 16:30 2016/04/29 11:00 2016/05/19 12:00 2016/05/18 11:00
SNFE UB 201607 Feed Barley No 2 business days prior to cutoff 2016/07/01 16:30 2016/06/30 11:00 2016/07/21 12:00 2016/07/20 11:00
SNFE UB 201609 Feed Barley No 2 business days prior to cutoff 2016/09/01 16:30 2016/08/31 11:00 2016/09/15 12:00 2016/09/14 11:00
SNFE UB 201611 Feed Barley No 2 business days prior to cutoff 2016/11/01 16:30 2016/10/31 11:00 2016/11/17 12:00 2016/11/16 11:00
SNFE VW 201701 NSW Wheet No 2 business days prior to cutoff 2017/01/03 16:30 2017/01/02 11:00 2017/01/19 12:00 2017/01/18 11:00
SNFE VW 201603 NSW Wheet No 2 business days prior to cutoff 2016/03/01 16:30 2016/02/29 11:00 2016/03/17 12:00 2016/03/16 11:00
SNFE VW 201605 NSW Wheet No 2 business days prior to cutoff 2016/05/02 16:30 2016/04/29 11:00 2016/05/19 12:00 2016/05/18 11:00
SNFE VW 201607 NSW Wheet No 2 business days prior to cutoff 2016/07/01 16:30 2016/06/30 11:00 2016/07/21 12:00 2016/07/20 11:00
SNFE VW 201609 NSW Wheet No 2 business days prior to cutoff 2016/09/01 16:30 2016/08/31 11:00 2016/09/15 12:00 2016/09/14 11:00
SNFE WK 201701 WA Wheet No 2 business days prior to cutoff 2017/01/03 16:30 2017/01/02 11:00 2017/01/19 12:00 2017/01/18 11:00
SNFE WK 201603 WA Wheet No 2 business days prior to cutoff 2016/03/01 16:30 2016/02/29 11:00 2016/03/17 12:00 2016/03/16 11:00
SNFE WK 201605 WA Wheet No 2 business days prior to cutoff 2016/05/02 16:30 2016/04/29 11:00 2016/05/19 12:00 2016/05/18 11:00
SNFE WK 201607 WA Wheet No 2 business days prior to cutoff 2016/07/01 16:30 2016/06/30 11:00 2016/07/21 12:00 2016/07/20 11:00
SNFE WK 201609 WA Wheet No 2 business days prior to cutoff 2016/09/01 16:30 2016/08/31 11:00 2016/09/15 12:00 2016/09/14 11:00
SOFFEX CONF 201603 SWISS BONDS No 2 hours prior to cutoff 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET) 2016/03/08 12:30 (CET) 2016/03/08 10:30 (CET)
SOFFEX CONF 201606 SWISS BONDS No 2 hours prior to cutoff 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET) 2016/06/08 12:30 (CET) 2016/06/08 10:30 (CET)
SOFFEX CONF 201609 SWISS BONDS No 2 hours prior to cutoff 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET) 2016/09/08 12:30 (CET) 2016/09/08 10:30 (CET)
  1. Physical Delivery rules for this contract are applicable to Cash/IRA accounts only.
  2. Open positions held after the close of the trading day indicated in this field become subject to liquidation.
  3. First Position Date and Time; cutoff applicable to long positions.
  4. Last Trading Date and Time; cutoff applicable to short positions.